9/00 Form No. 56040733
© 2000 Printed in USA, Nilfisk-Advance, Inc.
(page 1 of 3)
56419304 4 TUBE RADIATOR “T.U.” KIT
For Retriever
™
2060 (gas, propane & dual fuel with tip-up oil cooler)
and Nilfisk SR 1800 (gas, propane & dual fuel)
CONTENTS OF KIT
ITEM
PART NO.
QTY
DESCRIPTION
56040733
1
Instruction Sheet
A
56419277
1
Radiator, 4 Tube
B
56418605
2
Gasket, Bulb
C
56419287
1
Shroud Weldment G
D
56419284
1
Radiator Mount Weldment G
E
56418227
1
Hose, Lower Radiator
56419305 4 TUBE RADIATOR “D” KIT
For Retriever
™
2060 (diesel) and Nilfisk SR 1800 (diesel)
CONTENTS OF KIT
ITEM
PART NO.
QTY
DESCRIPTION
56040733
1
Instruction Sheet
A
56419277
1
Radiator, 4 Tube
B
56418605
2
Gasket, Bulb
F
56419282
1
Shroud Weldment
G
56419280
1
Radiator Mount Weldment
INSTALLATION INSTRUCTIONS
Removal
1
Disconnect the battery.
2
Open the left side door and the engine cover.
3
See Figure 1. Remove and save the hardware items
(H)
, that secure the oil cooler’s hydraulic hoses.
4
Loosen slightly the hydraulic hose at point
(J)
. Then tip the oil cooler up and out of the way.
5
Drain the engine coolant at the radiator’s drain plug.
6
Remove the engine cooling fan, (3) screws.
7
Remove two Screws
(K)
, Screw and Nut
(W)
, and three Screws
(L).
Disconnect the Bar
(M)
from the Radiator Mount Weldment
(N)
then take the
mount weldment out of the machine. Save the hardware for installing the new radiator mount weldment.
8
Separate the lower coolant Hose
(O)
from the engine by removing Hose Clamp(s)
(P)
.
9
Loosen Hose Clamp
(Q)
on Hose
(R)
and disconnect from the radiator.
10
Take out the Screws
(S)
mounting the radiator into the machine.
11
Disconnect the radiator overflow hose from the radiator.
12
Pull the radiator and shroud out of the machine together.
Summary of Contents for Advance Retriever 2060
Page 87: ...4 99 Form No 56040696 page 2 A 3 B C D 5 1 2 6...
Page 94: ...6 99 revised 3 00 Form No 56040702 page 2 5 3 2 6 6 5 3 4 1 2...
Page 111: ...9 00 Form No 56040733 page 2 of 3 Diesel H FRONT M K L N R W P O T S J Q O P U V FIGURE 1...
Page 128: ...PROGRAM PURPOSE and OBJECT ZENITH FUEL SYSTEMS Page 1 1 5 48 7 0 1 2 3 4 5 0 50...
Page 133: ...ZENITH FUEL SYSTEMS Page 5 1 5 0 50 A 50 4 4 B 8 6 A C D FIG 5 1...
Page 134: ...ZENITH FUEL SYSTEMS Page 5 2 6 5 8 0 8 2 0 2 0 2 E F 0 D 50 4 C D 5 5 5 5 6 6 2 0 6 FIG 5 2...
Page 139: ...Fuel Enrichment 4 6 6 50 5 5 6 A 50 5 0 0 ZENITH FUEL SYSTEMS Page 5 7...
Page 144: ...ZENITH FUEL SYSTEMS INC Page 5 12 3F 6 6 H J 3F FIG 5 19 6 G 6 FIG 5 20...
Page 147: ...ZENITH FUEL SYSTEMS Page 6 2 A A 1 6 FIG 6 1...
Page 148: ...ZENITH FUEL SYSTEMS Page 6 3 5 2 3 0 0 1 4 4 B 6 6 6 4 4 3 6 6 6 9 6 6...
Page 149: ...ZENITH FUEL SYSTEMS Page 7 2 8 2...
Page 150: ...ZENITH FUEL SYSTEMS Page 7 3 8 2...
Page 153: ...ZENITH FUEL SYSTEMS Page 9 3...
Page 160: ...ZENITH FUEL SYSTEMS Page 9 11 6 6 9 8 2...
Page 163: ...ZENITH FUEL SYSTEMS Page 9 14 6 6 9 8 Continued...