INSTALLING AND REMOVING THE OPTIONAL UNIT
5-7
9
Install the two (2) accessory
bolts of the Cutter Unit.
If it is difficult to recognize the bolt holes,
please float the Cutter Unit.
<Removing Procedures>
Please complete the operation by following
the reversed order of installation procedures
starting from step 9.
Next, please read “1.5 Installing the
Label Roll” on page 1-14 and install the
Label Roll.
After passing the front of label roll through
the Thermal Head, please follow the
procedures below to pass the front of label
roll through the Cutter Unit.
5.3.1
Passing the Label Roll through Cutter Unit
1
Raise the Cutter Unit and pass
the label into the Cutter Unit.
2
Close the Cutter Unit.
Push the Cutter Unit towards the inner side;
if it gives a short snapping sound it is
fastened.
Summary of Contents for DURA SI600
Page 1: ...THERMAL PRINTER INSTRUCTION MANUAL ...
Page 2: ......
Page 19: ...BEFORE OPERATION 1 3 Rear View ...
Page 20: ...BEFORE OPERATION 1 4 Operating Panel ...
Page 36: ...BEFORE OPERATION 1 20 ...
Page 48: ...BASIC OPERATIONS 2 12 ...
Page 54: ...SETUP PROCEDURE 3 6 3 1 3 Menu Flow of Setting Mode ...
Page 166: ...INSTALLING AND REMOVING THE OPTIONAL UNIT 5 12 ...
Page 167: ...INSTALLING AND REMOVING THE OPTIONAL UNIT 5 13 ...
Page 174: ......
Page 175: ...P N A2302B SECOND VERSION ...