2.5. UPS installation for parallel system
If the UPS is only available for single operation, you may skip this section to
the next.
Step 1.
Install and wires the UPS according to the section 2.3
Step 2.
Connect the output wires of each UPS to an output breaker.
Step 3.
Connect all output breakers to a major output breaker. Then this
major output breaker will directly connect to the loads.
Step 4.
Common battery packs or independent battery packs are
allowed.
Step 5.
Refer to the following wiring diagram:
Wiring diagram of parallel system for Ranger 180KT
Check section 3.5. for Parallel operation of UPS.
2.6. Software installation
For optimal computer system protection, install UPS monitoring software
from
https://www.power-software-download.com/viewpower.html
.
Operations
3
3.1. Initial operation
Step 1.
Before operation, make sure that the two strings of batteries
are connected correctly in order of ”+,GND,-” terminals and the breaker
of the battery pack is at “ON” position (only in case of external battery packs
presence).
Step 2.
Press the
POWER
button to set up the power supply for the
UPS. UPS will enter to power on mode. After initialization, UPS will enter to
“No Output mode”.
3.2. Screen description
After initialization, the LCD will display main screen.
There are five sub-menus: Control, Measure, Setting, Information and Data log.
Touch any sub-menu icon to enter into the sub-screen.
Main
Control
Measure
Setting
Info
Data Log
ON/OFF UPS
ON/OFF charger
Battery test
Mute all
Measure 1
Measure 2
Measure 3
Save setting
General
Advance
Basic 1
Basic 2
Electrical
Battery
Miscellaneous
Electrical
Battery
Miscellaneous
UPS self-test
SYS parameter
Install info
VOL CALLI
CURR CALLI
Initial
Data log
Parameters
Calibration
EEPROM
Touch
User
Maintainer
Basic info
Rated info
Parameter info
User mode
Password: 0000
Maintaner mode
Password: ****
Summary of Contents for Ranger 180KT
Page 25: ......