25
Fine alignment of the FDS
Procedure 5
Fine Alignment of the assembled Fiber Delivery System
1.
Remove the alignment tool from the CONNECT and insert the FD input
coupler into the CONNECT output port. Ensure to align the key with the slot
so that it is fully inserted.
2. Tighten the lock screw so that the FD is firmly held in the CONNECT port.
3. To align the FD output, setup a power meter. (A spectral analyzer can also be
used.)
4. Enable emission on the SuperK laser with the output power set to a low level
(See the previous
s.)
5. Check there is an optical beam emerging from the output using a detector
card.
6. Confirm the power meter measures a weak output level at the distal end of
the FDS. If not, disable the SuperK laser and repeat the coarse alignment,
.
7.
If after repeating the coarse alignment still no output is achieved, see
power measured at start of fine alignment” on page 29
8. To achieve the best output level, adjust the optical alignment using the four
alignment thumbscrews on the CONNECT as described in steps 9 and 10.
Also refer to the section
“Tips for steering the beam path” on page 26
.
9. Adjust the alignment thumbscrews pairs marked “I”, one after the other until
the maximum output level is achieved. Once pair “I” is aligned i.e. at
maximum power, repeat the same adjustment using the pairs marked “II”.
10. Repeat step 8 adjusting the thumbscrew pairs iteratively until the optimum
alignment has been achieved when no further power increase can be
realized.
11. The SuperK CONNECT is now aligned with the FD.
Note:
When using a power meter to measure the light from the FD connector, it is
recommended to use a sensor with a fast response time. Having instantaneous
feedback is advantageous when making fine adjustments using the CONNECT
thumbscrews.
Note:
If possible, set the power meter to display the power level using either a me-
ter view or graph view. Visually monitoring the output level this way, can facilitate
locating the optimum beam position.
Summary of Contents for SuperK CONNECT
Page 8: ...8 ...
Page 10: ...10 ...
Page 12: ...12 ...
Page 20: ...Mounting the CONNECT 20 ...
Page 34: ...Fiber and connector care 34 ...
Page 36: ...36 2 ...
Page 39: ...1 ...
Page 40: ...SuperK Fiber Delivery System Product Description Revision 1 0 08 2021 W 10456 ...