background image

12

CONTACT DETAILS:

Email : Sales@nobutts.com

Web : www.nobutts.com

Tel : 1-888-662-8887

No Butts Bins Company, Inc. 16 Birch Lane, Madison, CT 06443 

MAINTENANCE:

To ensure your products give you many years of use we recommend that you:

THANK YOU

FOR PURCHASING THIS PRODUCT

Clean panels regularly with soapy water

Ensure all fittings are tight (for example after a big storm)

Touch up any exposed metal should it get scratched

All Parts and Fixings checked by:

Print Name:

Signature:

Summary of Contents for NSSR1583F

Page 1: ...Assembly Instructions Shelter type SR1588 F SR1588 F 03 21022019 USA...

Page 2: ...16 16 15 7 1 11 5 6 8 4 13 12 10 2 3 9 14 8 18 2 Fittings Bolt set M10 Nut Washer Black Cap T25 AB1210 M10 x 60 mm 25mm Tech screw M10 x 100mm Concrete Bolt Pack C D 40 40 80 80 202 13 Required 40 40...

Page 3: ...157 5 8 ST4 ROOF TIE 2080 x 40 x 40 81 89 x 1 57 x 1 57 2 9 JF3 BRACKET 210 x 40 x 40 8 66 x 1 57 1 10 P4 POST 1995 x 40 x 40 78 54 x 1 57 x 1 57 1 11 L1 L BRACKET 95 x 45 3 74 x 1 77 8 12 FT1 FOOT BR...

Page 4: ...SUREMENTS IN GREEN INCHES CHECK DIMENSIONS TO ENSURE CORRECT ALIGNMENT CF1 JF1 S1C Ensure correct alignment on corners CB1 CB1 Step 1 Assemble S1C frames to make up the main structure using CB1 bracke...

Page 5: ...SCALE 1 9 S1 STUB JF2 CB1 JF1 DETAIL B SCALE 1 6 JF1 S1 STUB CB1 JF2 Step 2 Attach the S1 stubs to the front of the frame using CB1 JF1 and JF3 brackets then bolt the R4 Rafter into place using the RB...

Page 6: ...ST4 P4 JF3 DETAIL C SCALE 1 4 JF3 ON FRONT RB1 BELOW Step 3 Assemble the T section by joining the two ST4 tie bars using a JF3 bracket then join the P4 post using two RB1 brackets and attach a L1 bra...

Page 7: ...section to the shelter then fix the R4 rafters in place using more RB1 brackets on the rear and L1 brackets on the front Bolt the FT1 and F3 brackets to the shelter and move it to its final position...

Page 8: ...5 Stick the sealing strips SS to the rafters and line up the ACE2 panels with the outside of the shelter then equally space the ACC2 panels in the gap Apply more sealing strips on the top of the roof...

Page 9: ...A3 Step 6 Screw down the RC2 strips into the rafter with the 25mm tech screws to secure the roof panels Push EC40 end caps into any open ends of box section Screw A3 Angle onto the back edge of the t...

Page 10: ...070 2193 4263 TO FEET HOLES 4180 39 17 41 12 40 75 40 75 40 75 41 12 81 50 86 34 164 57 85 97 2183 14 10 PLAN VIEW OVERALL DIMENSIONS AND GROUND FIXING POSITIONS Suggested size for concrete base 200mm...

Page 11: ...Notes 11...

Page 12: ...06443 MAINTENANCE To ensure your products give you many years of use we recommend that you THANK YOU FOR PURCHASING THIS PRODUCT Clean panels regularly with soapy water Ensure all fittings are tight f...

Reviews: