FT3
FT1
ST3
CB1
JF1
P1
P1
A
CB1
ST3
DETAIL A
SCALE 1 : 5
JF1 INSIDE
CB1 UNDERNEATH
Step 2
Attach
P1
post using one
JF1
bracket, then attach
ST3
tie bar using
another
JF1
bracket and two
CB1
brackets.
Move the shelter to its final position, make sure the structure is square
and attach the
FT1
and
FT3
foot brackets to secure the shelter to the
ground.
NOTE: Insert
EC40
into
ST3
and
P1
before installing.