11
4. COMMISSIONING, TRANSPORTING, DECOMMISSIONING
a. Commissioning
Table 2: Commissioning data
Type
PSE12BSL / 3600 PSE12NSL / 3600
Commissioning
weight [kg]
865
835
Dimensions
[mm]
3600
3600
After receiving our new stacker or for re-commissioning you have to do following before (firstly)
operating the truck:
•
Check if are all parts included and not damaged
•
Make sure the tiller is assembled correctly (electrical socket is connected and fixed with two plastic
clamps, circlip of the axle is installed)
•
Check that battery is charged (follow chapter 8)
•
Do the work according to the daily inspections as well as functional checks.
b. Lifting/ transportation
For transporting, remove the load, lower the forks to the lowest position and fix the truck safe with
dedicated lifting gear according to the following figures.
Lifting
USE DEDICATED CRANE AND LIFTING EQUIPMENT
DO NOT STAND UNDER THE SWAYING LOAD
DO NOT WALK INTO THE HAZARDOUS AREA DURING LIFTING
Park the truck securely and lash the truck according to the points identified in Fig. 5. Lift the truck to its
destination and place the truck securely before removing the lifting gear. The lashing points are
according to the Fig. 5.
Fig. 5: Lifting with a crane
Fig. 6: Fixing points