1.
Start up the sprayer and test the sprayer’s functionality. The NORAC control panel does
not need to be powered on for the original boom function switches to operate. Unfold the
booms and raise/lower each boom and the main section.
Confirm that the cabling and hoses are agreeable to the entire range of motion.
2.
If any functions do not work, review the hydraulic and electrical portions of this manual to
check for proper installation.
3.
Turn on the power for the UC4.5 Control Panel using the switch on the side of its chassis.
4.
The procedure for the installation of the UC4.5 Spray Height Control system is now
complete. Begin the AUTOMATIC SYSTEM SETUP procedure as described in the UC4.5
Spray Height Control Operator’s Manual (M01).
Summary of Contents for UC4.5
Page 1: ...Hardi Aftermarket New Navigator New Commander Installation Manual HD7 HD12 ...
Page 6: ...3 3 Kit Parts 3 1 Kit Overview Figure 2 HD7 System Parts ...
Page 7: ...4 3 2 Hydraulic Plumbing Figure 3 Single Acting Force Boom Hydraulic Plumbing ...
Page 8: ...5 Figure 4 Double Acting Eagle Boom Hydraulic Plumbing ...
Page 22: ...19 Figure 17 Roll Sensors Mounted on an SPC Eagle Boom ...
Page 37: ...34 10 Cable Drawings 10 1 ITEM C03 44656D CABLE VALVE VARIABLE RATE DT ...
Page 38: ...35 10 2 ITEM C05 43210 20 CABLE UC5 NETWORK 18 AWG 20M ...
Page 39: ...36 10 3 ITEM C10 44650 51 CABLE UC4 5 POWER GENERIC PULL TYPE ...
Page 40: ...37 10 4 ITEM C11 44651 50 CABLE UC4 5 EXTENSION VALVE GENERIC ...
Page 41: ...38 10 5 ITEM C12 44658 42 CABLE UC4 INTERFACE AMP ML ONLY ...
Page 42: ...39 10 6 ITEM C13 44658 60 CABLE UC4 INTERFACE BYPASS AMP SUPERSEAL ...
Page 43: ...40 10 7 ITEM C16 44658 49 CABLE UC4 VALVE ROLL PIGTAIL ...
Page 44: ...41 10 8 ITEM C30 43250 06 CABLE UC5 BATTERY PIGTAIL FUSED ...