18
8
Hydraulic Installation
Ensure all pressure has been bled from the system before disconnecting any lines
or fittings. Hydraulic pressure will exist on the wing tilt circuits unless the wings
are being supported by other means. You may wish to perform the hydraulic
installation with the wings in transport position, resting on the ground or with the
tilt cylinders fully extended.
Component failure due to oil contamination is not covered under the NORAC UC5
system warranty. It is recommended that a qualified technician perform the
hydraulic installation.
8.1
Valve Assembly
1.
On a clean surface remove the plastic plugs from the block.
2.
Install the 6MB-6MOR (*F02) fittings into the P and T ports. Tighten to 18 ft-lbs (24 Nm).
3.
Insert the two orifices (F01) into the “B” ports with the notch facing out.
4.
Install the 6MB-6MOR (*F02) fittings into the “B” ports. Tighten to 18 ft-lbs (24 Nm).
5.
Install the 6MBP (*F03) plugs into the “A” ports. Tighten to 18 ft-lbs (24 Nm).
Figure 21: NORAC Valve Block Details
Summary of Contents for UC5 Rogator 600
Page 1: ...Spray Height Controller Rogator 600 Installation Manual RG09 ...
Page 6: ...3 3 Kit Parts 3 1 Kit Overview Figure 2 RG09 System Parts ...
Page 7: ...4 3 2 Hydraulic Plumbing Figure 3 RG09 Hydraulic Plumbing ...
Page 11: ...8 Figure 7 Wing Sensor Bracket Mounting on Chafer Boom Outer Inner ...
Page 19: ...16 Figure 19 Input Module Mounting ...
Page 29: ...26 10 7 ITEM C20 43240 01 CABLE UC5 INTERFACE TILT DT ...
Page 30: ...27 10 8 ITEM C21 43240 31 CABLE UC5 INTERFACE MAIN DT WITH AUX 1 2 3 ...