19
8.2
Valve Block Mounting
1.
Mount the valve block on the center section of the boom near the sprayer valve block, as
illustrated in
Figure 22
.
2.
Insert the threaded rod into the block and use a hex nut to hold the rod. The block holes
are 3/8” NC-1” deep. If bolts are used instead of the threaded rod, ensure the bolts thread
in at least 3/8”.
3.
Use the remaining hardware to secure the block to the sprayer.
4.
Cut off excess threaded rod, if necessary.
Figure 22: Valve Block Mounting
Ensure that the temperature probe from the Valve Module is attached to the
NORAC valve block as shown in the green square in Figure 22. This is NOT a
ground connection.
Summary of Contents for UC5 Rogator 600
Page 1: ...Spray Height Controller Rogator 600 Installation Manual RG09 ...
Page 6: ...3 3 Kit Parts 3 1 Kit Overview Figure 2 RG09 System Parts ...
Page 7: ...4 3 2 Hydraulic Plumbing Figure 3 RG09 Hydraulic Plumbing ...
Page 11: ...8 Figure 7 Wing Sensor Bracket Mounting on Chafer Boom Outer Inner ...
Page 19: ...16 Figure 19 Input Module Mounting ...
Page 29: ...26 10 7 ITEM C20 43240 01 CABLE UC5 INTERFACE TILT DT ...
Page 30: ...27 10 8 ITEM C21 43240 31 CABLE UC5 INTERFACE MAIN DT WITH AUX 1 2 3 ...