22
9
Software Setup
1.
Start up your sprayer and test the sprayer’s functionality. The display terminal does not
need to be powered on for the original boom function switches to operate. Unfold the
booms and raise/lower each boom and the main section.
Confirm that the cabling and hoses are agreeable to the entire range of motion.
2.
If any functions do not work, review the hydraulic and electrical portions of this manual to
check for proper installation.
3.
Turn on the power for the display terminal using the switch on the side.
4.
The procedure for the installation of the UC5 Spray Height Control system is now
complete. Begin the AUTOMATIC SYSTEM SETUP procedure as described in the UC5
Spray Height Control Operator’s Manual.
Summary of Contents for UC5 Rogator 600
Page 1: ...Spray Height Controller Rogator 600 Installation Manual RG09 ...
Page 6: ...3 3 Kit Parts 3 1 Kit Overview Figure 2 RG09 System Parts ...
Page 7: ...4 3 2 Hydraulic Plumbing Figure 3 RG09 Hydraulic Plumbing ...
Page 11: ...8 Figure 7 Wing Sensor Bracket Mounting on Chafer Boom Outer Inner ...
Page 19: ...16 Figure 19 Input Module Mounting ...
Page 29: ...26 10 7 ITEM C20 43240 01 CABLE UC5 INTERFACE TILT DT ...
Page 30: ...27 10 8 ITEM C21 43240 31 CABLE UC5 INTERFACE MAIN DT WITH AUX 1 2 3 ...