BC 60 "Trailblazer" Brushcutter
PRE-OPERATION
DEC/2012 (49458202/8203)
Section 2-23
TURNTABLE LOCK-UPS (REMOVAL AND INSTALLATION)
FAILURE TO ENGAGE ALL LOCKUP DEVICES BEFORE PROPELLING AT TRAVEL SPEED
CAN RESULT IN INJURY TO PERSONNEL AND/OR DAMAGE TO THE MACHINE.
Use the following procedures to install lock-ups. Note: With the exception of the suspension lockout, all lockups
are to be in place during track travel.
LOCKUP
PROCEDURE
Turntable
Attach lockup chains. Raise turntable to maximum height. Engage
attachment lock using control in cab. Lower turntable onto hooks. Insert pin
to prevent rotation.
Note: Turntable locks MUST be removed prior to lowering or locks will
be damaged.
Note: Not all machines have power locks for turntables. Some have
pins and chains only.
SUSPENSION LOCK-UPS (REMOVAL AND INSTALLATION)
Damage to the machine may occur if you lock or unlock the suspension
While the machine is moving. Always bring the machine to a complete
Stop prior to locking or unlocking the suspension.
NOTE: Do not lockout suspension when working or travelling at speeds greater than 12 mph.
LOCKUP
PROCEDURE
Summary of Contents for Trailblazer BC60
Page 2: ......
Page 48: ...BC 60 Trailblazer Brushcutter MAINTENANCE AUGUST 2012 49458202 8203 Section 3 3...
Page 49: ...MAINTENANCE BC 60 Trailblazer Brushcutter Section 3 4 AUGUST 2012 49458202 8203...
Page 64: ...BC 60 Trailblazer Brushcutter MAINTENANCE MARCH 2011 49458201 Section 3 21 TORQUE REQUIREMENTS...