7
2. With the help of a second person, carefully tip the
Uprights (20) and the Walking Platform (not shown) down
to the position shown.
Make sure that the Extension
Legs (90) remain in place.
Attach the Extension Legs (90) with four Extension
Screws (87);
start all four Extension Screws before
tightening any of them.
Next, attach the four Base Pads (81) to the base of the
Uprights (20) in the locations shown with four 1” Tek
Screws (82). Note: One replacement Base Pad may be in-
cluded. Use the Base Pad to replace any Base Pad that
becomes worn.
With the help of a second person, carefully tip the
Uprights (20) back to the vertical position.
87
90
90
20
82
87
82
4. Press the Upright Covers (75) onto the Uprights (20).
Attach each Upright Cover with a 3/4” Screw (7).
Be care-
ful not to damage the wires in the right Upright.
20
75
7
20
75
Wires
7
3. Slide the two Upright Covers (75) onto the ends of the
Pulse Bar (69). Align the holes in the lower ends of the
Pulse Bar with the holes in the Uprights (20).
Cut the tie securing the Pulse Wire (74) to the right
Upright (20).
Do not cut the indicated black tie.
Next,
connect the Pulse Wire to the Pulse Bar Wire (112).
The
connectors should slide together easily and snap into
place. If they do not, turn one connector and try
again.
Then, insert the wires down into the right Upright.
Hold the Pulse Bar (69) against the Uprights (20).
Do not
drop the Pulse Bar into the Uprights.
Attach the Pulse
Bar with the four Pulse Bar Bolts (66) and four Star
Washers (67).
Be careful not to pinch the wires. Start
all four Pulse Bar Bolts before tightening them.
Slide the Upright Covers (75) over the Pulse Bar Bolts (66).
20
20
75
75
69
74
112
66
67
66
67
112
74
Do Not
Cut
81
81
2
3
4