7
4. Identify the Right and Left Handlebars (59, 60),
which are marked with “Right” and “Left” stickers.
Orient the Right and Left Handlebars (59, 60)
so that the hexagonal holes are in the indi-
cated locations.
Attach each Handlebar (59, 60) to the Upright
(2) with two M8 x 38mm Button Bolts (72) and
two M8 Locknuts (61).
Make sure that the
Locknuts are in the hexagonal holes.
4
59
2
60
61
72
61
Hexagonal
Holes
72
3
2
Avoid pinching
the wires
1
3. While another person holds the Upright (2) near
the Frame (1), locate the wire tie in the Upright.
See the inset drawing.
Tie the lower end of
the wire tie to Pulse Extension Wire (79) and to
the Main Wire Harness (43). Next, pull the other
end of the wire tie upward out of the top of the
Upright (2). Then, untie and discard the wire tie.
Tip: Do not allow the ends of the wires to fall
into the Upright. Use a piece of tape or an
elastic band to hold the wires in place until
step 6.
Tip: Avoid pinching the wires.
Attach the
Upright (2) to the Frame (1) with an M10 x
63mm Bolt Set (62).
62
43
62
43
79
79
Wire Tie