background image

7.  

Remove and discard the Screws (A), and then 

remove the Pulse Crossbar (81). Remove the 

four 5/16" x 5/8" Screws (11).

8.  Attach the Trays (95, 96).

3

81

11

11

A

96

95

1

1

1

1

1

6.   Route the Upright Wire (91) through the Left 

Handrail (79). Attach the Left Handrail. Remove 

and discard the Screws (C). Repeat this step 

on the right side.

5.   Slide the Base Covers (88, 89) onto the 

Uprights (84, 85).

89

85

84

88

12

8

79

Wire

Tie

91

C

Reviews: