7
2. Identify the Left Upright (73) and the Right
Upright (74).
See the inset drawing.
Tie the wire
tie in the Right Upright securely around the end
of the Upright Wire Harness (75). With the help
of a second person, hold the Right Upright near
the Right Base Cover (77). Then, pull the other
end of the tie up through the rectangular hole in
the bottom of the Right Upright until the Upright
Wire Harness is routed completely through the
Right Upright.
Gently pull up on the Upright Wire Harness (75)
as you set the Right Upright (74) on the Base
(83) inside the Right Base Cover (77).
Be care-
ful not to pinch the Upright Wire Harness.
Attach the Right Upright (74) to the Base (83)
with two Upright Bolts (72) and two Upright Star
Washers (90). Note: It may be necessary to tip
the tops of the Uprights forward slightly as you
thread the Upright Bolts into the Uprights.
Do
not tighten the Upright Bolts yet.
Hold Left Upright (73) near the Left Base Cover
(76). Pull the TV Cable (49) and the AV Wire
(97) up through the rectangular hole in the bot-
tom of the Left Upright and out of the top of the
Left Upright. Set the Left Upright on the Base
(83) inside the Left Base Cover. Attach the Left
Upright to the Base with two Upright Bolts and
two Upright Star Washers (not shown).
Do not
tighten the Upright Bolts yet.
With the help of a second person, lower the
treadmill off the cardboard stand.
83
76
75
Tie
77
2
74
73
49
97
90
72
3. Identify the Right Upright Sleeve (96) and the
Left Upright Sleeve (95); the Upright Sleeves
are labeled. Slide the Right Upright Sleeve onto
the Right Upright (74) and the Left Upright
Sleeve onto the Left Upright (73).
95
“Right”
“Left”
96
3
74
73
75
74
Tie