12
L
R
6
4
11
78
103
102
6. Insert the Upright Wire (78) into the right Upright
(77) as you insert the Console Crossbar (101)
into the Uprights.
Be careful not to pinch the
Upright Wire
.
Loosen the four #8 x 1" Screws (102) (only two
are shown) one turn.
Tighten two 5/16" x 2 1/2" Screws (4) with two
5/16" Star Washers (9) into the side of the right
Upright (77) and into the Crossbar (103).
Do
not overtighten the Screws. Be careful not to
pinch the Upright Wire (78).
Next, tighten two 5/16" x 5/8" Screws (11) into
the right Upright (77) and the Console Crossbar
(101).
It may be necessary to slide the
Console Crossbar to align the holes.
Then,
tighten the two #8 x 1" Screws (102).
Attach the left Upright (not shown) to the
Console Crossbar (101) on the other side of
the incline trainer as described above.
9
77
101
7. Tighten two #8 x 3/4" Screws (1) into the
Console Base (87).
Do not overtighten the
Screws.
Identify the Right Handrail Assembly (93). Hold
the Right Handrail Assembly near the right
Upright (77). Insert the pulse wire from the Right
Handrail Assembly into the hole in the top of the
Upright and pull it out of the end of the Upright.
7
93
Pulse
Wire
1
1
87
77
Summary of Contents for Incline Trainer X9i Treadmill
Page 5: ...5 ...