14
9.
Attach the Console Base Back (89) to the
Console Base (87) with nine #8 x 3/4" Machine
Screws (16) and two #8 x 3/4" Screws (1) in the
locations shown.
Start all eleven Screws, and
then tighten them. Do not overtighten the
Screws. Make sure that no wires are pinched.
9
16
16
16
16
16
1
1
89
87
8. Hold the Left Handrail Assembly (86) near the
left Upright (77). Insert the pulse wire from the
left handrail assembly into the hole in the top
of the Upright and pull it out of the end of the
Upright.
Set the Left Handrail Assembly (86) onto the
left Upright (77).
Make sure that no wires are
pinched.
Attach the Left Handrail Assembly (86) with
two 3/8" x 5 1/2" Screws (5) and two 3/8" Star
Washers (8).
Note: Start the lower Screw first.
Insert the pulse wire through the three ties (only
two are shown). Connect the two “L” pulse wires
(see step 7).
R
L
8
86
Ties
Tie
77
5
8
“L” Pulse
Wire
Start First
Summary of Contents for Incline Trainer X9i Treadmill
Page 5: ...5 ...