5
ASSEMBLY
Assembly requires two persons. Place all parts of the exercise cycle in a cleared area and remove the packing
materials. Do not dispose of the packing materials until assembly is completed.
Assembly requires the included tools and your own adjustable wrench .
Use the drawings below to identify the small parts used in assembly. The number in parenthesis below each
drawing refers to the key number of the part, from the PART LIST on page 25. The second number refers to the
quantity needed for assembly. Note: Some small parts may have been pre-assembled for shipping. If a part
is not in the parts bag, check to see if it has been pre-assembled.
M10 Nylon
Locknut (63)–2
M8 Split
Washer (55)–12
M10 Split
Washer (88)–2
M8 Washer
(60)–4
M10 x 52mm Button Bolt (82)–2
M8 Nylon
Locknut (89)–4
M8 x 40mm Button
Bolt (81)–4
M10 x 118mm Button Screw (78)–2
M8 x 25mm Button
Screw (79)–4
M4 x 16mm
Screw (57)–5
1/4” x 16mm Button
Screw (80)–8
M8 x 40mm Button
Screw (54)–8
1. Identify the Front Stabilizer (15). While another person
lifts the front of the Frame (1), attach the Front
Stabilizer to the Frame with four M8 x 40mm Button
Screws (54) and four M8 Split Washers (55).
15
1
55
55
54
54
1