17
4.1
Inspection
After receiving:
– Inspect shipping boxes for damage.
Any damages of the shipping boxes must be reported to the shipping company without delay.
– Check packing slip to ensure all parts has been delivered.
All material shortages are to be reported to your Nordmann supplier within 48 hours after receipt of
the goods. Nordmann Engineering AG assumes no responsibility for any material shortages beyond
this period.
The standard delivery includes:
– Nordmann Omega Pro steam humidifier equipped with the options ordered according
, packed in cardboard box with:
– Fastening set
– Installation manual (this document), operation manual and spare parts list
– Water drain hose with hose clamp
– Supply cable between Module A to Module B (for double units only)
– Data cable between Module A to Module B (for double units only)
Note: the supply cable and the data cable are supplied in the box of main unit A.
– Ordered accessories with manual according
, packed separately.
– Unpack the parts/components and check for any damage.
If parts/components are damaged, notify the shipping company immediately.
– Check whether the components are suitable for installation on your site according to the unit data
stated on the specification label.
4
Receiving and storage