1
Quick Start Guide
Easy 11-Step Setup
Follow these steps to get your Ultimus IV ready for operation.
Ultimus
™
IV Dispensing System
• Unpack the unit.
• Now is a good time to activate your Two Year Warranty. Register the
warranty online at www.nordsonefd.com/warranty/dispensers/two/
Unpack the Unit/Warranty
1
Install Barrel Holder & Cable Guide
2
∑
∏
π
∫
∂
Part A: Install Barrel Holder
• Install mounting blocks using two screws each.
Blocks may be mounted in the forward or rear position on either side.
∂
• Remove barrel holder sleeve from holder.
∑
• Insert the 6 mm screw through the barrel holder and bracket, and then
into the top hole of the front mounting block. Tighten screw to secure.
∏
• Insert barrel holder sleeve.
Part B: Install Cable Guide
• Insert thumbscrew through both
the cable guide mount and star washer,
and then into other mounting block.
π
• Position flex arm into
channel of cable guide mount.
∫
• Tighten thumbscrew to secure arm to cabinet.
• Snap flexible cable assembly into swivel bracket,
located at top of flex arm.
ª
ª
Electronic pdf files of Nordson EFD manuals are also available at
www.nordsonefd.com