Installation
3-5
P/N 7146386A
E
2008 Nordson Corporation
VBN w/o Control System
Installation Personnel’s Experience
The instructions contained in this section are intended for personnel with
experience/authorization in the following fields:
S
Application methods with hot melt adhesive or similar materials
S
Industrial electrical wiring of power and control lines
S
Industrial mechanical installation
S
General knowledge of process control.
CAUTION:
Illuminated seals may not be installed in the application system.
Screwing on Light Tower (Option)
The light tower is not attached upon delivery of the melter. Use the two
screws M5 to fasten the light tower to the top of the electrical cabinet.
Fig. 3-5
Casters
Installing Kit
The kit consists of two pair of casters with brakes and one pair of fixed
wheels without brakes.
NOTE:
Attach the casters with brakes (Fig. 3-6, right) to the side of the
electrical cabinet and in the center of a twin tank unit.
1. Lift the melter with a suitable floor conveyor (e.g. fork lift).
2. Detach machine feet.
3. Attach casters. Use the fastening holes for the machine feet to attach
the casters.
Fig. 3-6
Summary of Contents for VersaBlue 100H/100H
Page 46: ...Installation 3 14 P N 7146386A E 2008 Nordson Corporation VBN w o Control System...
Page 74: ...Maintenance 5 24 P N 7146386A E 2008 Nordson Corporation VBN w o Control System...
Page 94: ...Repair 7 14 P N 7146386A E 2008 Nordson Corporation VBN w o Control System...
Page 96: ...Parts 8 2 P N 7146386A E 2008 Nordson Corporation VBN w o Control System...