background image

22

Leak Check

After the gas piping to the furnace is complete,
all connections must be tested for gas leaks. To
check for leaks use only a soap and water
solution or other approved method.

Some Utilities

Require Shut-

Off Valve to 

be 4 to 5 feet

Above Floor

Denotes field-
provided and
installed
components.

Shut-Off Valve

with 1/8" NPT

Plugged Tap

Burner Viewport

Roll-Out Limit

Automatic Gas Valve

(with manual shut-off)

Burner
Assembly

Ground 
Joint
Union

the collector box is clear of any debris or
obstructions.

2.

Replace this tube and insure the fit to the
header spout is air tight. Air will be drawn
into the header if this connection is not tight.

3.

Check other tube connections along the
drain system.  Insure that all are air tight.

NOTE: Industry research studies indicate that
when condensate is routed to an active drain,
household detergents, etc., buffer its acidity. If
the drain is not actively used or if codes require,
obtain a neutralizer kit (usually contains lime-
stone).  Proper drains and connections to the
condensate tubing are required as NORDYNE
cannot be held responsible for water leakage
which occurs due to loose hose connections or
improperly sealed drain line pipes.

GAS SUPPLY AND PIPING

This furnace is equipped for either left or right
side gas entry. Typical gas service hook-ups are
shown in Figure 22. When making the gas
connection provide clearance between the gas
supply line and the entry hole in the furnace
casing to avoid unwanted noise and/or damage
to the furnace.

All gas piping must be installed in compliance
with local codes and utility regulations. Some
local regulations require the installation of a
manual main shut-off valve and ground joint
union external to the furnace. The shut-off valve
should be readily accessible for service and/or
emergency use. Consult the local utility or gas
supplier for additional requirements regarding
placement of the manual main gas shut-off. In
the absence of local codes the gas line installa-

Figure 22.  Typical Gas Service Connection

Some Utilities
Require Shut-
Off Valve to 
be 4 to 5 feet
Above Floor

Denotes field-
provided and
installed
components.

Shut-Off Valve
with 1/8" NPT
Plugged Tap

Burner Viewport

Automatic 
Gas Valve
(with manual 
shut-off)

Burner

Assembly

Ground Joint
Union

Roll-Out Limit

tion must comply with the latest edition of the
National Fuel Gas Code (ANSI Z223.1) or (CAN/
CGA B149) installation codes.

A 1/8" NPT plugged tap must be installed in the
gas line to the unit for use when measuring the
gas supply pressure. The plug should be readily
accessible for service use. A drip leg should be
installed in the vertical pipe run to the unit. Table
5 lists gas flow capacities for standard pipe sizes
as a function of length in typical applications
based on nominal pressure drop in the line.

NOTE:

Gas piping must not be run in or

through air ducts, chimneys, gas vents, elevator
shafts, etc.

Compounds used on threaded joints of gas
piping must be resistant to the actions of lique-
fied petroleum gases.

The main manual gas valve and main power
disconnect to the furnace must be properly
labeled by the installer in case emergency shut-
down is required.

!

 CAUTION:

Do not use matches, lighters, candles,
or other sources of open flame to
check for gas leaks.

Summary of Contents for G6RC 90+

Page 1: ...ndensing Furnace Residential Gas Furnaces WARNING Improper installation adjustment al teration service or maintenance can cause injury or property damage Re fer to this manual for assistance For addit...

Page 2: ......

Page 3: ...ical Venting 20 Vent Freezing Protection 20 Concentric Vent Termination 20 Drainage of Condensate From Furnace 21 Gas Supply and Piping 22 Leak Check 22 Conversion 23 High Altitude Application 23 Natu...

Page 4: ...ndensate Drain Outlets A B Combustion Air Vent See Fig 15 for sizes 1 1 2 x 3 1 2 Dia Opening for Gas Connection 3 4 3 4 3 4 22 1 2 Exhaust Vent Combustion Air Inlet 1 1 2 x 3 1 2 Dia Opening for Gas...

Page 5: ...2 Knockout For Gas Connection Bottom Opening 27 7 8 19 3 4 7 8 Dia Electric Connection 24 1 2 3 4 43 21 7 8 21 1 2 15 1 2 21 1 2 10 1 4 Bottom Supply Air Opening Side Exhaust Vent 2 1 1 2 x 3 1 2 Dia...

Page 6: ...1250 69 1150 75 1440 60 1410 61 1370 63 1320 66 1270 68 1210 72 1140 1060 1230 1210 1180 1140 1090 1030 960 880 1860 56 1800 58 1730 60 1650 63 1570 66 1480 70 1380 75 1270 82 1650 63 1610 65 1550 67...

Page 7: ...71 1460 72 1410 75 1370 77 1450 73 1430 74 1400 75 1360 78 1340 79 1300 81 1270 83 1230 1280 1210 1180 1140 1090 1070 1030 990 1140 1090 1060 1030 980 35 950 36 910 37 870 39 875 39 835 41 820 41 805...

Page 8: ...National Fuel Gas Code is available from American National Standards Institute Inc 1430 Broadway New York New York 10018 Canada installations shall comply with CAN CGA B149 installation codes local pl...

Page 9: ...ases are factory supplied accessories part numbers 902677 and 902974 When the furnace is in stalled on a factory or site built cased air condi tioning coil the sub base is not necessary However the pl...

Page 10: ...ventilation or to improve indoor air quality the system must be designed so that the return air to the furnace is not less than 50 F 10 C during heating operation If a combination of indoor and outdoo...

Page 11: ...refer to the former as direct vent or two pipe installation Installation with air taken from around the furnace is sometimes referred to as one pipe installation i e only the vent exhaust pipe is prov...

Page 12: ...in 30 sq in 35 sq in 40 sq in Round Duct Diameter 4 5 5 6 6 7 8 Furnace Water Heater Vent or Chimney Figure 10 Equipment in a Confined Space with all Combustion Air drawn from Outdoors through Exterio...

Page 13: ...heater rated at 45 000 Btuh and a furnace rated at 75 000 Btuh requires a volume of 6 000 cubic feet 50 x 45 75 6 000 to be considered unconfined If the space has an 8 foot ceiling the floor area of t...

Page 14: ...ion and provide air for combustion and ventilation per the previous section The capac ity table provided in this section applies to the total of vent and combustion air piping for either type of insta...

Page 15: ...exhaust in the same atmospheric pressure zone i e both must exit the building though the same portion of exterior wall or roof Vent piping must be sloped upwards not less than 1 4 per foot in the dire...

Page 16: ...ose Clamps Optional Not Shown 5 8 Inlet Exhaust Combustion Air Inlet Offset with Exhaust Pipe for Adequate Dimensional Clearance PVC or ABS Pipe See Vent Table 4 Straps or Other Suitable Supports at M...

Page 17: ...e Front Straight Neoprene Couplings with 2 Hose Clamps Optional Not Shown Combustion Air Inlet 2 PVC on G6RL 040 060 models 3 PVC on G6RL 080 100 models 2 PVC Exhaust Vent All Models Furnace Top Combu...

Page 18: ...of the hose clamps Then slide the other end of the rubber coupling onto the other pipe from the vent and securethecouplingwiththesecondhoseclamp Ensure that the connection is tight and leak free NORDY...

Page 19: ...between the flame and the flame sensor If you note oscillations occurring check the vent configura tion Make sure that the exhaust vent does not have a 90 degree termination Figure 18 Alternate Horizo...

Page 20: ...Figure 20 are maintained d No other gas fired appliances are vented through the chimney Vent Freezing Protection When the vent pipe is exposed to temperatures below freezing i e when it passes through...

Page 21: ...ghten for Step 3 Route to floor drain OR Route to condensate pump Keep downward slope Collector Box A Rotate counter clockwise Step 2 8 Left Side Drain HARD J Drain Tube Clamp Loosen For Step 1 Retigh...

Page 22: ...installed in compliance with local codes and utility regulations Some local regulations require the installation of a manual main shut off valve and ground joint union external to the furnace The shu...

Page 23: ...personal injury or death Conversion Conversion of this furnace to use LP propane gas must be made by qualified service personnel using only approved parts High Altitude Application High altitude appl...

Page 24: ...imum temperature rating of 105 C Refer to the furnace nameplate and Table 11 for electrical requirements Line Voltage Wiring The line voltage 115 volt to the furnace must be supplied from a dedicated...

Page 25: ...cted Adverse affects include radiant loading from fireplaces sunlight or lighting fixtures and convective loading from warm air registers or electrical appliances To check the heat anticipator setting...

Page 26: ...ter the furnace has run for approximately five minutes set the thermostat below room temperature and verify steps 9 through 11 of the SEQUENCE OF OPERATION Verifying and Adjusting Firing Rate The firi...

Page 27: ...l clear window on the burner box The burner flame should carry over between all burners The flames should be blue without yellow tips Flames should extend from each burner without lifting curling or f...

Page 28: ...1 643 58 62 310 621 60 60 300 600 62 58 290 581 64 56 281 563 GAS FLOW RATE CU CUBIC FEET PER REVOLUTION OF METER TIME FOR ONE REVOLUTION SECONDS 1 5 10 80 45 225 450 82 44 220 439 84 43 214 429 86 42...

Page 29: ...7 8 9 4 5 6 1 2 3 EAC HUM M1 M2 M3 COOL HEAT L1 XFMR Unused Motor Leads EAC Electronic Air Tap 5A 120 VAC Status Light Red Heating Speed Tap Cooling Speed Tap Humidifier Tap 5A 120 VAC Connect Neutra...

Page 30: ...E FLAME ROLL OUT SWITCH ALL MODELS VENT PRESSURE SWITCH 93 MODELS ONLY PRESSURE SWITCH R Y G W C Y 180 120 90 60 THESE WIRES ARE NOT PRESENT ON 3 SPEED MODELS BLOWER DECK SWITCH SELECT MODELS ONLY Leg...

Page 31: ...ned monthly during the heating season New or newly renovated homes may require more frequent changing until the construction dust has been removed Lubrication The bearings in the circulating air blowe...

Page 32: ...on Air Intake 19 Exhaust Vent G6RC G6RD Upflow Furnaces 1 Ignitor Not Shown 2 Flame Sensor Not Shown 3 Gas Valve 4 Flame Roll out Switch s 5 Pressure Switch 6 Vent Pressure Switch G6RD Only Not Shown...

Page 33: ...of ignitor warm up the gas valve 24 VAC will open The ignitor circuit stays energized for 6 seconds after the gas valve opens 7 The furnace control must prove flame via the flame sensor six seconds af...

Page 34: ...r ignition it will try again every hour if a call for heat remains If the inducer and circulating air blowers are operating and items 1 through 8 have been checked press the red reset button on the ve...

Page 35: ...e operating Manifold Pressure ____________________ in water column with furnace operating Is there adequate fresh air supply for combustion and ventilation _____________ Furnace Input ________________...

Page 36: ...St Louis MO 7079310 Replaces 7078950 Specifications and illustrations subject to change without notice and without incurring obligations Printed in U S A 9 99 707931 707931...

Reviews: