![background image](http://html1.mh-extra.com/html/noritz/gq-c3257wx-ff-us/gq-c3257wx-ff-us_owners-manual_1705076011.webp)
11
Initial Operation
Before the first use of your water heater, do the following:
Follow steps
1 through 4
.
1
Open the water supply valve.
Open a hot water fixture to confirm that
water is available, and then close the
fixture again.
3
Open the gas supply valve.
Hot water fixture
2
Turn on the power.
CLOSED
4
OPEN
Do not touch with wet hands.