PLUG TYPE
16A Euro Schuko
13A BS 1363
16A CEE "Commando"
32A CEE "Commando"
2x16A Euro Schuko
2x13A BS 1363
3x16A CEE 3 Phase
No other appliances may be connected to the same fuse. The electrical connections for the
cabinet are shown in the wiring diagram in the plastic wallet attached to the side of the electrical
terminal box. Always replace the wiring diagram after use.
All electrical connections must be carried out by approved and qualified personnel
and comply with all IEE and local regulations. Failure to do so could result in
personal or fatal injury.
NOTE
4. Operation
The cooling is achieved by a fan evaporator system. The evaporator is located at the bottom tray
or the lower part of the rear wall, depending on the version. The cold air is blown to the shelves
through the perforated back wall and through the cooling cell in the top corner.
The cabinet is equipped with a NRC-100 controller, which turns off the cabinet's lights in case of
a pressure rise caused, for example, by dirt in the condenser.
See
figure 1 on the inside cover
for the location of the cabinet's light switch.
4.1. Starting up
1. Connect the plug to the supply socket.
The compressor and fans start operating.
2. Wait for 90 minutes or until the desired temperature is reached.
The cabinet is now ready to be filled.
4.2. Loading cabinet
• Position the products carefully.
• Do not exceed the load limit. The maximum load on the shelves is 100 kg per metre.
5
Version 2/2010
ENGLISH
PI
Summary of Contents for EUROCLASSIC
Page 1: ...USER S GUIDE ...
Page 2: ...ON OFF min 20 ELECTRIC DIAGRAM FAKTA MANUAL ...
Page 13: ......
Page 14: ......
Page 15: ......