Check the
where the
system modules, the
telephones, and auxiliary equipment are to be installed.
Location requirements
Clean, dry, and well-ventilated
Temperature:
to
to 122°F)
Humidity: 5% to
non-condensing
Location: at least 4 m (13.1 ft) from equipment such as
photocopiers, electrical motors, and other equipment that
can produce electromagnetic, radio frequency, and
electrostatic interference.
Mounting requirements
If a smooth surface is not available, cut a backboard large
enough to accommodate the system modules and the
distribution panel.
Chart 1
dimensions and required clearances.
Dimension
Length
Width
55.6
cm
(21.9 in)
35.6
cm
(14 in)
Height
Weight
Clearance (front)
a.7
cm
5.25
kg
l m
(3.4
in)
(11.6 lb)
(39.4 in)
Clearance (top)
Clearance (bottom)
30
cm
3 0 c m
(ii.8
in)
(11 .a
in)
Summary of Contents for Compact 616 DR5
Page 1: ...Compact 616 DR5 Installer Guide http stores ebay com UsefulCDs...
Page 54: ...nontar Compatt DR5 Coordinator Guide...
Page 70: ...12 II Display services Compact DR5 System Coordinator Guide...
Page 222: ...164 Voice Call Compact DR5 System Coordinator Guide...
Page 273: ...Compact DR5 Programming Record E...