10-00
Page 4
2008-12-03
2. FOR YOUR SAFETY
2.1 SAFETY OVERVIEW
General
Every person working with the Nortec MH must have read and understood the
installation and operating instructions before carrying out any work. Knowing and
understanding the contents of the installation and operating instructions is a basic
requirement for protecting all personnel against any kind of danger, to prevent faulty
operation, and to operate the unit safely and correctly.
All signs and markings applied to the unit must be observed and kept in a readable
state.
Qualification of personnel
All work (installation, operating, servicing, etc.) described in these installation and
operating instructions
may only be carried out by a specialist who is well trained
and adequately qualified and is authorized by the customer
.
For safety and warranty reasons any action beyond the scope of this manual must be
carried out only by qualified personnel authorized by the manufacturer.
It is assumed that all persons working with the Nortec MH are familiar and comply with
the appropriate regulations on work safety and the prevention of accidents.
Intended use
The Nortec MH Adiabatic Air Humidifier/cooler is intended exclusively for
air
humidification/air cooling in air ducts or air handler
within the specified operating
conditions. Any other type of application, without the written consent of your Nortec
Representative, is considered as not conforming with the intended purpose and may
lead to the Nortec MH becoming dangerous.
Operation of the equipment in the intended manner requires
that all the information
in these instructions are observed (in particular the safety instructions)
.
Summary of Contents for MH Series
Page 1: ...2544832 A MH Series EVAPORATIVE HUMIDIFIER COOLER Installation Manual TM ...
Page 5: ...10 00 Page 1 2008 12 03 10 00 INTRODUCTION ...
Page 21: ...10 10 Page 17 2008 12 03 10 10 INSTALLATION ...
Page 37: ...10 20 Page 33 2008 12 03 10 20 PLUMBING ELECTRICAL INSTALLATION ...
Page 42: ...10 20 Page 38 2008 12 03 1 3 3 Wiring Diagram Nortec MH Flow Figure 7 Wiring Diagram MH Flow ...
Page 44: ...10 20 Page 40 2008 12 03 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 45: ...10 30 Page 41 2008 12 03 10 30 OPERATION ...
Page 48: ...10 30 Page 44 2008 12 03 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 49: ...10 40 Page 45 2008 12 03 10 40 MAINTENANCE TROUBLESHOOTING ...