3. CONTROLS AND REMOTE COMMUNICATION (OPTIONAL)
A.
DIGITAL CONTROL OPERATION
(1) Figure 11 shows the components of the NORTEC Controller and how to adjust the
setpoint.
(2) In the case of a modulating NORTEC Controller, Figure 12 shows the relation between
the difference from setpoint to %rh in the room and the 0-10 V DC demand signal sent
out. From this basis the NORTEC Controller uses its PI algorithm to adjust its demand
signal in accordance with the history of the environment. This type of control allows for
tighter and more precise control.
B.
DIGITAL TRANSDUCER OPERATION
(1) The NORTEC digital transducers, shown in Figure 13, are designed to sense humidity
in duct or in room respectively, and report it back to a controller or the NHTC directly.
Required humidifier output is determined by controller or humidifier.
C.
REMOTE CONNECTIONS (OPTIONAL)
CAUTION
NORTEC DOES NOT RECOMMEND USING THE DRY RELAY
CONTACTS WITH ANYTHING MORE THAN 24 VAC, 1 AMP.
(1) The NHTC reports the signal light status, in Table 3, by closing the supplied dry contact
relays which can be wired back to a BMS or monitoring station. This method of
monitoring is not as informative as the actual display, but alerts you to the general
status of the unit.
Figure 11. NORTEC Digital Controller
Summary of Contents for NH Series
Page 1: ...Manual No H 101 2006 09 15 NH Series ELECTRODE STEAM HUMIDIFIER Installation Manual TM ...
Page 9: ...10 00 Page 1 2006 09 15 10 00 INTRODUCTION ...
Page 10: ...10 00 Page 2 2006 09 15 Figure 1 NHTC ...
Page 14: ...10 00 Page 6 2006 09 15 Figure 6 Typical NHTC Installation Sheet 1 of 2 ...
Page 15: ...10 00 Page 7 2006 09 15 Figure 6 Typical NHTC Installation Sheet 2 of 2 ...
Page 16: ...10 00 Page 8 2006 09 15 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 17: ...10 10 Page 1 2006 09 15 10 10 INSTALLATION PROCEDURES ...
Page 20: ...10 10 Page 4 2006 09 15 Figure 3 Water Drain and Supply Connection ...
Page 41: ...10 10 Page 25 2006 09 15 Figure 24 Typical SAM e Duct Installation ...
Page 45: ...10 10 Page 29 2006 09 15 Figure 27 Drain Water Cooler Option Installation with SAM e ...
Page 48: ...10 10 Page 32 2006 09 15 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 49: ...10 20 Page 1 2006 09 15 10 20 OPERATION ...
Page 54: ...10 20 Page 6 2006 09 15 Figure 6 Basic Steam Production Method ...
Page 56: ...10 20 Page 8 2006 09 15 Figure 7 Software Flow Chart Sheet 1 of 7 ...
Page 57: ...10 20 Page 9 2006 09 15 Figure 7 Software Flow Chart Sheet 2 of 7 ...
Page 58: ...10 20 Page 10 2006 09 15 Figure 7 Software Flow Chart Sheet 3 of 7 ...
Page 59: ...10 20 Page 11 2006 09 15 Figure 7 Software Flow Chart Sheet 4 of 7 ...
Page 60: ...10 20 Page 12 2006 09 15 Figure 7 Software Flow Chart Sheet 5 of 7 ...
Page 61: ...10 20 Page 13 2006 09 15 Figure 7 Software Flow Chart Sheet 6 of 7 ...
Page 62: ...10 20 Page 14 2006 09 15 Figure 7 Software Flow Chart Sheet 7 of 7 ...
Page 72: ...10 20 Page 24 2006 09 15 Figure 14 NORTEC OnLine Status Page ...
Page 73: ...10 30 Page 1 2006 09 15 10 30 MAINTENANCE PROCEDURES ...
Page 79: ...10 40 Page 1 2006 09 15 10 40 TROUBLESHOOTING ...
Page 91: ...10 50 Page 1 2006 09 15 10 50 TECHNICAL ...
Page 95: ...10 50 Page 5 2006 09 15 Figure 4 NHTC NHPC Wiring Diagram ...
Page 108: ...10 50 Page 18 2006 09 15 THIS PAGE INTENTIONALLY LEFT BLANK ...