Table 7. Design Indoor Conditions For Various Places, Products and Processes (cont)
Product and/or Process
Temperature
Relative
Humidity
%RH
°F
°C
Clean Rooms – Computer Rooms
Computer Room
Clean Room – General
Clean Room – Critical
70 – 80
70 – 74
71.5 – 72.5
21 – 27
21 – 23
22 – 22.5
40 – 60
40 – 60
43 – 47
Distilling
Grain Storage
General Manufacturing
Aging
60
0 – 75
65 – 72
16
16 – 24
18 – 22
35 – 40
45 – 60
50 – 60
Electrical Products
Coil and Transformer Winding
X-ray Tube Assembly
Instruments Manufacture and Laboratory
Thermostat and Humidistat Assembly and Calibration
Close Tolerance Assembly
Meter Assembly and Test
Fuse and Cutout Assembly, Capacitor Winding and Paper Storage
Conductor Wrapping with Yarn
Lightning Arrestor Assembly
Thermal Circuit Breaker Assembly and Test Water Wheel Generators
Thrust
Runner Hopping
Processing Selenium and Copper Oxide Plates
72
68
70
76
72
76
73
75
68
76
70
74
22
20
21
24
22
24
23
24
20
24
21
23
15
40
50 – 55
50 – 55
40 – 45
60 – 63
50
65 – 70
20 – 40
30 – 60
30 – 50
30 – 40
Fruit Storage
Apples
Apricots
Grapefruits (California)
Grapefruits (Florida)
Grapes (Eastern)
Grapes (Western)
Lemons
Oranges (California)
Oranges (Florida)
Peaches and Nectarines
Plums
Specialty Citrus Fruit
30 – 40
31 – 32
58 – 60
50
31 – 32
30 – 31
58 – 60
40 – 44
32 – 34
31
30 – 32
38 – 40
-1– 4
-1 – 0
14 – 16
10
-1 – 0
-1
14 – 16
4 – 7
0 – 1
-1
-1 – 0
3 – 4
90
90 – 95
85 – 90
85 – 90
85
90 – 95
86 – 88
85 – 90
85 – 90
90
90 – 95
90 – 95
Fur Storage
40 – 50
4 – 10
55 – 65
Gum
Manufacture
Rolling
Stripping
Breaking
Wrapping
77
68
72
74
74
25
20
22
23
23
33
63
53
47
58
Hospitals
Operating, Cystoscopic and Fracture Rooms
Patient Rooms
Intensive Care Unit
Administrative and Service Areas
68 – 76
75
75
70 – 80
20 – 24
24
24
21 – 27
50
40 – 50
40
30 – 50
Leather
Drying
Storage, Winter Room Temperature
70 – 120
50 – 60
21 – 49
10 – 16
75
40 – 60
Lenses (Optical)
Fusing
Grinding
75
80
27
27
45
80
Summary of Contents for NHPC
Page 1: ...2538144 B NH Series NHTC NHPC ELECTRODE STEAM HUMIDIFIER Engineering Manual TM ...
Page 9: ...10 00 Page 1 2008 10 01 10 00 INTRODUCTION ...
Page 10: ...10 00 Page 2 2008 10 01 Figure 1 NHTC ...
Page 13: ...10 00 Page 5 2008 10 01 Figure 2 Optimum Boiling Time Figure 3 Conductivity ...
Page 18: ...10 00 Page 10 2008 10 01 Figure 6 Typical NHRS Installation Sheet 1 of 2 ...
Page 19: ...10 00 Page 11 2008 10 01 Figure 7 Typical NHRS Installation Sheet 2 of 2 ...
Page 20: ...10 10 Page 12 2008 10 01 10 10 HUMIDITY STEAM ABSORPTION AND DISTRIBUTION ...
Page 35: ...10 10 Page 27 2008 10 01 Figure 2 Psychrometric Chart ...
Page 64: ...10 10 Page 56 2008 10 01 Figure 30 NORTEC OnLine Monitoring ...
Page 71: ...10 20 Page 63 2008 10 01 10 20 SPECIFICATIONS ...
Page 81: ...10 30 Page 73 2008 10 01 10 30 SUBMITTALS ...
Page 86: ...10 30 Page 78 2008 10 01 Figure 2 Primary Line Voltage Wiring to Unit ...
Page 87: ...10 30 Page 79 2008 10 01 Figure 3 Physical Data NHTC NHPC 005 030 ...
Page 88: ...10 30 Page 80 2008 10 01 Figure 4 Physical Data NHTC NHPC 050 100 ...
Page 89: ...10 30 Page 81 2008 10 01 Figure 5 Physical Data NHTC NHPC 150 200 ...
Page 96: ...10 30 Page 88 2008 10 01 Figure 12 In Duct AHU Installation With Mounting Frame Installation ...
Page 98: ...10 30 Page 90 2008 10 01 Figure 13 In Duct AHU Installation With Mounting Frame Installation ...
Page 100: ...10 30 Page 92 2008 10 01 Figure 16 Atmospheric SAM e Adapter Dimensions ...
Page 101: ...10 30 Page 93 2008 10 01 Figure 17 Atmospheric Steam Header and Adapter Configuration ...
Page 102: ...10 30 Page 94 2008 10 01 Figure 18 Physical Data for Remote Mounted Blower Pack ...
Page 103: ...10 30 Page 95 2008 10 01 Figure 19 Physical Data Units with Optional Built On Blower Packs ...
Page 104: ...10 30 Page 96 2008 10 01 Figure 20 Physical Data Units with Optional Built On Blower Packs ...