MM571W / MM572W Installation Instructions
26
●
Remove the gate post and gate brackets.
●
Use a hammer and center punch to mark the
center of the mounting locations.
●
Using a permanent marker, mark the center of
the mounting locations for the gate post bracket
subassembly.
●
Remove the operator arm from the gate post and
gate brackets.
●
Mark the center of the mounting locations for the
gate bracket.
PUSH-TO-OPEN OPERATOR MOUNTING
Step 6
Step 5
Step 7
Q
K
U
●
Close the gate and reattach the operator to the
gate bracket.
●
Ensure that the operator arm is level and the
brackets are securely clamped.
●
Secure the post pivot bracket in place by
installing the hardware shown. Tighten both bolts
‘O’ and ‘Q’.
Your Property