background image

3

Figure 3. roof installation

Maintain 12" (18" for 

Canada) Min. clearance 

above roof or highest 

anticipated snow level, 

max. 24" above roof.

Combustion

Air

Support

(Field Supplied)

Vent

Combustion Air

45˚ Elbow

(Field Supplied)

Roof Boot/

Flashing

(Field Supplied)

Vent

through structure's hole (Figure 5). 

noTe: Do not allow 

insulation or other materials to accumulate inside pipe 

assembly when installing through hole.

5. Secure the assembly to the structure as shown in Figure 

5 using field supplied metal strapping or equivalent 

support material.

noTe1: Ensure termination location clearance as 

shown in Figure 5.

noTe2: If assembly needs to be extended, the 2 pipes 

supplied in the kit may be replaced by using the same 

diameter, field supplied SDR-26 PVC (D2241) pipe. 

Do not expand dimension "D" more than 60 inches 

(See Figure 2).

 Warning:

do not operate the furnace with rain cap removed. 

recirculation of combustion products may 

occur, or water may accumulate inside larger 

combustion air pipe and flow into the burner 

enclosure. Failure to follow this warning could 

result in product damage or improper operation, 

personal injury or death.

 CauTion:

do noT use field supplied couplings to extend 

pipes. airflow restriction will occur and the 

furnace pressure switch may cause intermittent 

operation.

6. Cement field supplied furnace combustion air and vent 

pipes to concentric vent termination assembly.

7. Run furnace through a complete heat cycle to ensure 

combustion air and vent pipes are properly connected 

to concentric vent termination connections.

Figure 4. rain Cap to Vent pipe alternate assembly

Drill Clearance Hole in Rain Cap and Pilot 

Hole in Vent Pipe

Stainless Steel Screw

(Field Supplied)

is desired for cleaning. See Figure 4.
6. Cement field supplied furnace combustion air and vent 

pipes to concentric vent termination assembly.

7. Run furnace through a complete heat cycle to ensure 

combustion air and vent pipes are properly connected 

to concentric vent termination connections.

procedure 2: Side Wall Termination

1. Determine the best location for termination kit. Refer to 

the Installation Instructions supplied with the furnace.

2. Cut one hole, 5” diameter if using a 3" kit or a 4” diameter 

hole if using 2" kit.

3. Partially assemble the concentric vent termination kit 

as shown in Figures 1 and 2.

a. Cement Y concentric vent fitting to larger diameter 

kit pipe.

b. Cement rain cap to smaller diameter kit pipe.

4. Install cemented Y concentric fitting and pipe assembly 

Reviews: