background image

7

Figure 5. Unit Horizontally Suspended

Threaded 

Rod

Lag
Bolt

Nuts (x2)

Washer 

and 

Lockwasher

Nuts (x2)

from the factory with all the parts required for horizontal 
left applications and horizontal right applications. If your 
unit does not have parts for a horizontal application, a 
kit is available.

NOTE: In all horizontal applications in which the unit is 
installed above a finished ceiling and/or living space, a 
secondary drain pan must be installed under the entire unit 
to avoid damage to the ceiling in the event of condensate 
overflow. Additionally, it is recommended that an approved 
water level indicator or float switch device be used to 
shut down the unit in the event water is detected in the 
auxiliary drain pan.

If suspending the air handler from the ceiling, assemble 
a support frame (Figure 5) using slotted iron channel and 
full threaded rod. Fasten the frame together with nuts, 
washers, and lockwashers. Secure the support frame 
to the rafters with lag bolts. The air handler can also be 
suspended using steel straps around each end of the 
unit. The straps should be attached to the air handler with 
sheet metal screws and to the rafters with bolts.

Horizontal Left Installations:
1. Remove the coil access door.
2. Remove the plug from one of the threaded holes in the 

horizontal drain pan. Completely remove the webbing 
located in the threaded holes of the horizontal drain 
pan. IMPORTANT: If the webbing is not removed, the 
condensate will not drain properly and ceiling damage 
may occur.

3. Insert the plug (from horizontal drain pan) into the open 

and unused drain hole in the drain pan at the bottom 
of the unit to block bypass air.

4. Remove the corresponding drain line knockout from 

the coil access door to allow access to the horizontal 
drain.

5. Replace the door and attach the drain line.

Horizontal Right Installations:
1. Remove the coil access door. Unscrew the line-set tube 

close-off plate from the front left cabinet rail.

2. Slide the coil and drain pan assembly out of the unit.
3. Remove the sheet metal hairpin covers (if supplied) 

from the back of the coil and discard.

4. Place the horizontal drain pan on the opposite side of 

the coil. On units with 2 sets of knockouts, remove the 
other set of knockouts in the coil spacing plates and 
insert support rod.

5. Slide the coil and the horizontal drain pan assembly 

back into the unit. Re-attach the tube close off plate.

6. Remove the plug from one of the threaded holes 

in the horizontal drain pan. Completely remove the 
webbing located in the threaded holes of the drain 
pan. IMPORTANT: If the webbing is not removed, the 
condensate will not drain properly and ceiling damage 
may occur.

7. Insert the plug (from horizontal drain pan) into the open 

and unused drain hole in the drain pan at the bottom 
of the unit to block bypass air.

8. Remove the corresponding drain line knockout from 

the coil access door to allow access to the horizontal 
drain.

9. Replace the door and attach the drain line.

The unit may also be installed in a horizontal application 
with the unit suspended from the ceiling. A typical 
installation of the unit in a suspended horizontal application 
is shown in Figure 5.

Figure 4. Horizontal Configurations

HORIZONTAL RIGHT

HORIZONTAL LEFT

RETURN

AIR

RETURN

AIR

Summary of Contents for B5BM

Page 1: ...ion service adjustment or maintenance may cause explosion fire electrical shock or other hazardous conditions which may result in personal injury or property damage Unless otherwise noted in these ins...

Page 2: ...ns 11 Control Board 12 Twinning 12 Heater Kits 12 Startup Adjustments 12 Before You Start the Unit 12 Refrigerant Charging 13 Air Circulation 13 Running the Blower Continuously 13 Continuous Low Speed...

Page 3: ...his unit Unqualified individuals should not attempt to interpret these instructions or install this equipment Failure to follow safety recommendations could result in possible damage to the equipment...

Page 4: ...ervice access and noise The dimensions of the room or alcove must be able to accommodate the overall size of the unit and the installation clearances listed in Figure 1 Physical dimensions for this ai...

Page 5: ...duct opening or filter rack located in the bottom of the unit Accessing the filter does not require tools and can be removed from the front of the unit by removing the filter door See Unit Maintenanc...

Page 6: ...hen installing the unit in an upflow configuration All return air must enter from the bottom of the unit A typical upflow unit is shown in Figure 2 Downflow Installations Thedownflowaccessorykit SeeTe...

Page 7: ...orizontal drain pan into the open and unused drain hole in the drain pan at the bottom of the unit to block bypass air 4 Remove the corresponding drain line knockout from the coil access door to allow...

Page 8: ...quid lines must be sized in accordance with the condensing unit specifications See Figure 11 page 16 for liquid and suction line locations When connecting refrigerant linesets together it is recommend...

Page 9: ...h lineset tubes to proper length in accordance with the outdoor unit specifications Verify the ends are round clean and free of any burrs 4 Positiongrommetonlinesetwithsufficientdistanceaway from braz...

Page 10: ...ccurring 7 Wrap the refrigerant lines with pressure sensitive neoprene or other suitable material especially where the lines enter the opening in the sheet metal 8 Evacuatethesystemofmoistureandnon co...

Page 11: ...the unit Use only copper wire for the line voltage power supply to this unit Use proper code agency listed conduit and a conduit connector for connecting the supply wires to the unit Aluminum supply...

Page 12: ...vided 3 Connect the heater kit plug with the mating receptacle on the air handler control board If a heater kit is not installed 1 Remove the 2 wire plug of the air handler by cutting the wires and di...

Page 13: ...un for several minutes and then set the thermostat s temperature below room temperature Verify the blower cycles off with the thermostat Minimum Electric Heat Airflow The minimum electric heat airflow...

Page 14: ...he factory It is recommended that the filter be cleaned or replaced monthly Newly built or recently renovated homes may requiremorefrequentchanginguntiltheconstructiondust has minimized Filter sizes s...

Page 15: ...11 4 15 8 17 8 11 4 3 1 4 2 5 8 11 8 K O typ 13 4 K O typ 1 7 8 3 5 8 5 5 8 DETAIL D 3 1 4 2 1 4 15 1 4 13 SUCTION LIQUID W 1 1 8 1 7 8 7 8 K O H 22 A Cabinet Size H W A Detail D A 43 5 16 14 3 16 12...

Page 16: ...Motor Mount Kit Blower Motor Transformer Capacitor Circuit Breaker 60A Heating Element Assembly Filter Tracks Blower Wheel Blower Housing Motor Control Board Control Board Filter Door Upper Door Assem...

Page 17: ...1270 1196 1113 1018 913 Corrected ESP1 0 00 0 00 0 00 0 09 0 23 0 36 0 50 0 64 42 48K B Cabinet Low 1324 1302 1271 1233 1187 1134 1072 1003 Corrected ESP1 0 00 0 06 0 17 0 27 0 38 0 49 0 61 0 72 Medi...

Page 18: ...Conditioner with Variable Speed Air Handler Typical 2 Stage Cooling Heat Pump with Optional Outdoor Thermostat Variable Speed Air Handler W2 W1 O Y Y2 G R C W2 W1 O Y Y2 G R C Y2 Y2 Y2 Y2 W1 W3 R Y1...

Page 19: ...19 C R G Y Y2 O W1 W2 Y1 24VAC COM FUSE P2 P3 X13 COM X13 HEAT X13 COOL XFMR L1 VSPOWER L1 L2COM L2 L2 Figure 13 Motor Control Board...

Page 20: ...8 9 10 11 12 13 14 15 16 G C O HUM Y1 W R HUM Y Y2 L2 COM 2 L2 L2COM L1 VS POWER XFMR COOL HEAT Y1 HEATER PLUG P3 1 2 3 4 5 6 7 8 YELLOW BLUE RED JUMPER SELECTOR SWITCHES NOTE 1 ON 0 OFF 710544D Repl...

Page 21: ...IELD WIRING LEGEND LOW VOLTAGE HIGH VOLTAGE The blower motor speed tap connection may not be as shown See the Installation Instructions Disconnect all power before servicing Transformer may have a dua...

Page 22: ...ct all power before servicing 3 Transformer may have a dual voltage primary tap Match the tap position with the supply voltage used 4 If the Internal wiring is replaced use only 105 C copper wire of t...

Page 23: ...K GREY BLACK GREY BLUE ORANGE POWER PLUG LIMIT RED RED RED RED BLACK BLACK RED BLACK RELAY RELAY TERMINAL BLOCK for select models only CIRCUIT BREAKER Circuit breaker models only BLUE W2 W1 O Y Y2 G R...

Page 24: ...pply voltage used 4 If the Internal wiring is replaced use only 105 C copper wire of the same gauge W2 W1 O Y Y2 G R C 4 SPD MOTOR 1 2 3 5 6 4 TRANSFORMER 24V BLACK RED WHITE BLACK WHITE FUSE L2 COM 2...

Page 25: ...1 2 3 5 4 TRANSFORMER 24V BLACK RED WHITE BLACK WHITE FUSE BLOWER MOTOR PLUG C L G N N NEUTRAL G GROUND L LINE C COMMON L2 L2 L2 COM L1 L1 XFMR X13 COOL X13 HEAT 24 VAC RED COM GREY Y1 C L G N WHITE X...

Page 26: ...1 only On Stage 1 Heat on instantly Heat blower on after 3 second delay Stage 3 5 Heat on after 1 minute delay Stage 2 Heat on after 2 minute delay Stage 4 6 Heat on after 3 minute delay Off Heat stag...

Page 27: ...27...

Page 28: ...sareprimarilyintendedtoassistqualifiedindividuals experienced in the proper installation of this appliance Some local codes require licensed installation service personnel for this type of equipment P...

Reviews: