7
Figure 11
Figure 12
Removal of Air Housing, Blower Wheel and Motor (See
Figures 14 - 16)
1. Shut off power to unit.
2. Remove elect wires.
3. Remove 4, 1/4" screws (2 on each side of air housing).
4. Remove band screw, 5/16" bolt.
5. To replace, reverse steps 1-4.
The 3 circuits of the primary control (see Figure 14) are the
Starting Circuit, Safety Circuit, and the Running Circuit.
Testing the Primary Control Circuits
1. Shut off power to the unit. Close off oil supply.
2. Remove thermostat wires from T1 and T2 and cad cell
wires from F1 and F2.
3. Turn on power to the unit.
4. Jumper out terminals T1 and T2 to test the starting
circuit. The burner should come on and then shut down
after 45 seconds as the safety circuit engages.
Remove Hot Surface Ignition Series
(See Figure 12)
1. Shut off power to the furnace.
2. Remove all wires 24 volt and 120 volt.
3. Remove 2, 1/4" screws.
4. To remount, reverse steps 1-3.
Removing C Burner Motor (See Figure 4, page 19)
1. Shut off power to the furnace.
2. Remove wires from HSI control.
3. Remove 4, 1/4" screws and HSI control.
4. Remove 2, 1/4" screws and panel cover.
5. Disconnect wires to motor; 2 red and 2 black.
6. Remove 1, 5/8" screw from housing strap and lift off
motor.
7. To reinstall, reverse steps 1-6.
Figure 13
Figure 14
Figure 15
Figure 16