xiv
MM271 Installation Instructions
MM271 Installation Instructions
1
7/16” Bit
5/16” Bit
Drill
Pliers
Level
Clamps
Adjustable
Wrench
Pen
Center
Punch
Hammer
Tape
Measure
Small
Flat Head
Philips Head
Screwdriver
Flat Head
Screwdriver
Wire
Stripper
Hack Saw
1/2”
wrench
9/16”
wrench
● 12 Volt automotive or marine battery and a
weather proof case.
● Low voltage wire will be needed to run from
the transformer to the control box; length
depends upon the distance between the
transformer power supply and the control box.
See Transformer Wiring Installation on
,
and the accessory catalog.
● PVC conduit.
● If your gate is more than 1000' away from an
AC power source you will need to use at least
one Mighty Mule solar panel to trickle charge
the battery. See the accessory catalog (Do not
use both transformer and solar).
● If you have thin-walled tube or panel gates, see
Recommended Reinforcement Examples after
Step 3 of “Mounting Operator to Gate”.
● Depending on the type of gate, a horizontal
cross member or mounting plate may be
needed to mount the front of the operator and
gate bracket to the gate. See Gate Bracket
Mounting Examples after Step 3 of “Gate
Operator Installation.”
● Surge protection for transformer.
● Some types of installations require u-bolts.
● Additional washers or a metal plate may be
needed for wooden post.
● Weatherproof cover for outdoor outlet and
transformer.
● If the post is larger than 6”, bolts longer than
8” are needed.
ITEMS NOT INCLUDED
TOOLS NEEDED
1
2
3
5
5
L
V
O
F
G
T
S
S
E
B
N
N
3
Thin Walled
Tube Gate
Gate
Bracket
1” x 6” Wood Reinforcement
Panel
Gate
Gate
Bracket
Wood or Metal
Reinforcement
(not supplied)
Mounting Plate
Created for
Decorative Gate
(required but not
supplied)
Remove excess bolt length
with hacksaw or bolt cutters
FRONT VIEW
SIDE VIEW
Reinforcement and Gate Bracket Mounting
Muffler Clamp
(not supplied)
Gate
Bracket
4
1
2
1" Min. - Pinch-Point Clearance
Top View
1" Min.
7”–13"
2
1
Closed
Position
Open
Position
stroke
2
1
Attach operator to gate and post bracket and secure with required
hardware.
Assemble post bracket parts. Do not completely tighten during
this step.
With Gate in OPEN position, using clamps, secure operator to
gate post and center cross member of gate.
Recommended reinforcement and gate bracket mounting
examples.
Swing gate and operator arm to the CLOSED position-check
clearance/binding by inspecting alignment. Arm stroke should be a
maximum of 13”.
TIP: Turning the pivot bracket over gives more
hole alignment options for the post pivot bracket assembly.
Remove clevis pin from the gate bracket and support loose
operator.
Installation
GATE OPERATOR INSTALLATION