Page No 18 of 52 Reznor, PREEVA Neos, Installation Manual, EN 2021-05, D301315 Iss 1
I
Condensate drain
All PREEVA Neos units are designed
with a built-in drain connection
complete with a U trap. This will
need to be filled with water (via
the flue outlet opening) during
commissioning.
Follow local regulations for the
correct disposal of condensate.
A PVC condensate discharge pipe should be
run by the installer to connect the drain from
the unit to the nearest foul drainage point.
Condensate water does not belong in a rain-
water tank!
A condensate disposal system that relies
on gravity should be satisfactory for most
installations. If a gravity system is not possible, a
condensate pump must be installed. There are a
number of commercially available pumps made
for this purpose.
If using a condensate pump, follow the pump
manufacturer’s installation recommendations.
Condensate drain pipe connections must be
glued, to prevent condensation water dripping
from the drain pipe.
The condensate water coming from the unit
heater has a pH-level of approx 4.6 and can
affect materials made from zinc and/or copper,
hence it is strongly advised against letting the
condensation water flow off through the gutter.
To ensure the condensation water does not
freeze, it is recommended to mount the drain
pipe inside the building. If there is no other
choice but mounting it outside, it is strongly
recommended to equip it with frost proof
insulation. For external units it may be necessary
to fit trace heating to the condensation pipe to
prevent freezing.
Model
PRN-I
025
035
045
055
070
100
PRN-E
Condensate
l/hr
0.65
0.75
0.88
1.00
1.25
1.75
Table 3 Condensate drainage flows
Gas connection
A competent and/or qualified engineer is
required to either install a new gas meter to the
service pipe or to check that the existing meter
is adequate to deal with the rate of gas supply
required. Installation pipes should be fitted in
accordance with national standards so that the
supply pressure, as stated in the technical data
section will be achieved.
It is the responsibility of the competent engineer
to ensure that other relevant standards and
codes of practice are complied with in the
country of installation. Pipes of smaller size
than the heater inlet gas connection must not
be used. The complete installation must be
tested for soundness as described in the country
of installation. Support gas piping with pipe
hangers, metal strapping, or other suitable
material.
Do not rely on the unit to support
the gas pipework installation.
Before installation, check that
the local distribution conditions,
nature of gas and pressure, and
adjustment of the appliance are
compatible.
This appliance is designed for a
maximum gas supply pressure of
50mbar. When pressure testing the
supply piping with test pressures
above 50mbar, disconnect the
heater and manual valve from the
gas supply line that is to be tested.
Cap or plug the supply line.
All sealing products must be resistant to the
action of liquefied petroleum gas or any other
chemical constituents of the gas being supplied.