133
.
Carrier Remote IPE acceptance testing
Contents
This section contains information on the following topics:
“Checking the system” (page 134)
“Setting up test conditions” (page 135)
“Performing acceptance testing” (page 135)
Introduction
This section describes Carrier Remote IPE functional testing to verify
that functions and features associated with the Carrier Remote IPE are
operating correctly.
Overview
Acceptance testing is conducted after the system has been installed, is
powered up, and appears to be functioning correctly; that is, all LEDs,
displays, and system messages indicate that the system is operating
correctly. The Carrier Remote IPE acceptance testing should be
conducted after:
•
a previously installed system is upgraded with Carrier Remote IPE
equipment with REM_IPE 286 carrier software or higher and operates
correctly without Carrier Remote IPE equipment
•
a newly installed system with Carrier Remote IPE equipment using
REM_IPE 286 carrier software or higher appears to operate correctly
Acceptance testing verifies the operation of system functions and features
at the remote site equipped with the Carrier Remote IPE.
Acceptance testing consists of:
Nortel Communication Server 1000
Carrier Remote IPE Fundamentals
NN43021-555 04.01
4 June 2010
Copyright © 2007-2010 Nortel Networks. All Rights Reserved.
.
Summary of Contents for Communication Server 100
Page 213: ......