Performing tests using the DCSM in the directed mode
9-5
Wireless Solutions
DualMode 800 Enclosure
Maintenance Manual
MTX08
Preparing for Control Channel tests
Before any of the Control Channel tests can be invoked from the MAP
terminal, the DCSM as well as the DCCH or ACCH to be tested must be
posted. The Control Channel test setup is described in Procedure 9-2.
Note: For MTX04 monitoring only needs to be invoked to run the CCH
power test. For earlier MTX releases, monitoring must be invoked for all
CCH tests.
Procedure 9-2
Control Channel test set-up
Step
Action
Observation
1
At the MAP terminal, post the DCSM by entering:
>
MAPCI;MTC;MTX;CELL <cell_number>
>
CTU;POST <DCSM_number>
2
Make sure that the posted DCSM is in the INSV (in service) state.
If not, place the DCSM to the INSV state by entering:
>BSY;RTS
3
Post the Control Channel to be tested by entering:
>
CCH;POST <channel_number>
4
Make sure that the posted CCH is in the INSV state. If not, place
the CCH to the INSV state by entering:
>
BSY;RTS
5
If the DCSM is in a sectored configuration, force the DCSM to scan
the DCCH of the sector that is to be tested by entering:
>
MON ON <x, y, z, u, v, or w>,<A,D,BOTH>
(Sector Designation) (ACCH, DCCH, or Both)
For example: >
MON ON X D
(You must only monitor the CCH
under test)
A = monitor ACCH
only
D = monitor DCCH
only
Both = monitor both
CCH types through
background
monitoring
6
The DCSM is now ready to test the desired CCH.
Summary of Contents for DualMode 800
Page 2: ......
Page 4: ......
Page 6: ...vi Publication history Nortel Networks Confidential 411 2051 500 Draft 00 01 November 1999...
Page 82: ...2 20 Periodic maintenance 411 2051 500 Draft 00 01 November 1999...
Page 90: ...3 8 Test equipment and precautions 411 2051 500 Draft 00 01 November 1999...
Page 100: ...5 6 Master Oscillator tests 411 2051 500 Draft 00 01 November 1999...
Page 106: ...6 6 Antenna and transmission line tests 411 2051 500 Draft 00 01 November 1999...
Page 116: ...8 4 Alarm Control Unit ACU tests 411 2051 500 Draft 00 01 November 1999...
Page 138: ...10 2 ICRM tests 411 2051 500 Draft 00 01 November 1999...
Page 200: ...12 10 Enclosure maintenance 411 2051 500 Draft 00 01 November 1999...
Page 208: ...A 8 Appendix A Frequency table 411 2051 500 Draft 00 01 November 1999...
Page 215: ......