Chapter 25 — Fault locating and clearing
Page 535 of 536
Option 11C Compact
Planning, Installation, Fault Clearing and CCBR Guide
8
If there was a sysload (SYSLOAD) while you were clearing a fault,
reset the correct time and date by entering
LD 2
STAD (day) (month) (year) (hour) (minute) (second)
Check the time and date you entered
TTAD
End the session in LD 2 and log out of the system
****
LOGO
9
Replace any covers that were removed.
10
Tag defective equipment with a description of the fault and return it to
a repair center.
—————————— End of Procedure ——————————
Summary of Contents for Meridian Meridian 1
Page 3: ...553 3121 210 Standard 3 0 January 1999 ...
Page 17: ...xiv Contents 553 3121 210 Standard 3 0 January 1999 ...
Page 97: ...Page 78 of 536 Chapter 8 Installing a new system 553 3121 210 Standard 3 0 January 1999 ...
Page 107: ...Page 88 of 536 Chapter 10 Installing the system ground 553 3121 210 Standard 3 0 January 1999 ...
Page 113: ...Page 94 of 536 Chapter 11 Installing the power supply 553 3121 210 Standard 3 0 January 1999 ...
Page 125: ...Page 106 of 536 Chapter 12 Adding an expansion cabinet 553 3121 210 Standard 3 0 January 1999 ...
Page 209: ...Page 190 of 536 Chapter 18 Connecting the trunks 553 3121 210 Standard 3 0 January 1999 ...
Page 323: ...Page 304 of 536 Chapter 21 Installing Hospitality 553 3121 210 Standard 3 0 January 1999 ...
Page 419: ...Page 400 of 536 Chapter 23 Pre programmed data 553 3121 210 Standard 3 0 January 1999 ...
Page 555: ...Page 536 of 536 Chapter 25 Fault locating and clearing 553 3121 210 Standard 3 0 January 1999 ...