Always check for overhead power lines or utility lines in the immediate area to avoid contact with the
trailer and light post. Also make sure there is enough clearance beside the machine when the mast arm is
swung open.
&ŝŐƵƌĞϭ͗>ŝŌƉŽŝŶƚƐŽŶƚŚĞWd>Ϯ͘ϰdž
CAUTION
!
• The PTL 2.4x weighs 2940 lbs (1334 kg). Ensure all lifting and rigging equipment is rated to lift the load.
• Failure to follow this instruction can result in damage to the trailer and associated equipment.
1. Open mast arm assembly to horizontal position (see Fig. 2, 3).
Note: Do not lift trailer with the light post in the vertical position.
2. Tilt the solar array to 60° (see Fig. 2, 3).
3. Connect straps as per trailer signal housing con
fi
guration (see Fig. 2, 3).
&ŝŐƵƌĞϯ͗,ŝŐŚͲ>Žǁ^ŝŐŶĂůŽŶĮŐƵƌĂƟŽŶ
&ŝŐƵƌĞϮ͗,ŝŐŚͲ,ŝŐŚ^ŝŐŶĂůŽŶĮŐƵƌĂƟŽŶ
Rigging
Rigging
Rigging