36
Northstar 2 kW Radar Installation Manual
4.9
Radar system checklist
When you've finished the wiring, visually check that:
each component is securely mounted and able to withstand rough sea conditions.
all the cables are correctly installed.
any cable shield mesh is correctly configured.
all cable entry points are watertight.
water can't leak into the scanner.
Now you're ready to set up the radar with the Northstar system that you're using.
Summary of Contents for 2 kW
Page 1: ...Northstar 2 kW Radar Installation Manual 1 ...
Page 51: ......