background image

Summary of Contents for 220 CD - INFORMATION BOOKLET

Page 1: ......

Page 2: ...220 CD ENGLISH ...

Page 3: ......

Page 4: ...BY DIRECTIVE 2003 44 EC 1 2 HOMOLOGATION CERTIFICATION DESIGN CATEGORY AND IDENTIFICATION 4 2 1 EXPLANATION OF MANUFACTURER S PLATE 4 2 2 TECHNICAL DATA 5 2 3 CE CERTIFICATE 6 2 4 LOCATION OF FITTINGS AND ELECTRICAL EQUIPMENT 7 2 5 LOCATION OF SEACOCKS AND THROUGH HULL FITTINGS 8 2 6 BLACKWATER SYSTEM 8 3 SYSTEMS AND CIRCUITS 9 3 1 ELECTRICAL SYSTEM 9 ...

Page 5: ...ficate number BMTSVT012 Date yr month day 2006 01 06 Name of Notified Body for noise emission assessment if applicable Address Town Post Code Country ID Number Module used for construction assessment A Aa B C B D B E B F G H Module used for noise emission assessment A Aa G H Other Community Directives applied DESCRIPTION OF CRAFT Craft Identification Number Brand name of the craft NORTHSTAR 220 CD...

Page 6: ...er I declare on behalf of the craft manufacturer that the craft mentioned above complies with all applicable essential requirements in the way specified and is in conformity with the type for which above mentioned EC type examination certificate has been issued delete text between brackets if no EC type examination certificate has been issued Name and function Cengiz ARSAY Signature and title Pres...

Page 7: ...n 3 3 12217 1 Openings in hull deck and superstructure 3 4 9093 9094 1 12216 Flooding 3 5 11812 Manufacturer s maximum recommended load 3 6 14946 Liferaft stowage 3 7 9650 Escape 3 8 12216 Anchoring mooring and towing 3 9 15084 Handling characteristics 4 11592 Engines and engine spaces 5 1 Inboard engine 5 1 1 Ventilation 5 1 2 Exposed parts 5 1 3 Outboard engine starting 5 1 4 Fuel system 5 2 Gen...

Page 8: ...cording to EN ISO 12217 1 and your inflatable boat according to EN ISO 6185 3 so that the requirements for the number of persons allowed and the additional loading could be determined 2 1 EXPLANATION OF MANUFACTURER S PLATE The manufacturer s plate which is fixed at the console looks like the following Design Category B The boat was built for the category of design B Offshore Category B Designed f...

Page 9: ...ded load Always load the craft carefully and distribute loads appropriately to maintain design trim approximately level Avoid placing heavy weights high up 0609 CE marking with EC identification number of the notified body International Marine Certification Institute as a proof that the boat was built according to the requirements of the Directive for Recreational Crafts 94 25 EC as amended by Dir...

Page 10: ...NORTHSTAR MANUAL 6 2 3 CE CERTIFICATE ...

Page 11: ...LECTRICAL EQUIPMENT A ELECTRIC BILGE PUMP B GAS LPG CONTAINER C WATER FILL D MANUAL BILGE PUMP E MAIN BATTERY SWITCH F ELECTRIC BILGE PUMP G BLACKWATER DISCHARGE H FUEL FILL I FIRE EXTINGUISHER J EXIT K EXIT L LIFERAFT AREA Not available in all models ...

Page 12: ...charges Livewell and Baitwell discharges Manual and electric bilge pump discharges at the side of hull Electric Bilge Pump and Kitchen sink discharges at the side of hull Manual Bilge Pump 1 3 2 4 5 6 7 Deck Sea 1 Toilet 2 Holding Tank 3 Vent 4 Y valve 5 Pump out deck fitting 6 Macerator pump 7 Seacock and valve Blackwater System 2 5 LOCATION OF SEACOCKS AND THROUGH HULL FITTINGS Not available in ...

Page 13: ... of the COLREGS which requires a minimum of 1 meter height difference between the navigation lights and the pole light You are not required to keep this light installed during daytime when there is good visibility At night or when the visibility condition dictates the use of the pole light simply remove it from its location under the aft center locker and install it in the plug provided on the aft...

Page 14: ...ve Bus Main switch Battery Outboard Engine Electric System of Northstar 220 CD Full Cabin Lights Livewell Pump Refrigerator Macerator Windlass Windlass Bilge Pump 12 V Bilge Pump 12 V Switch Panel 12 V Switch Panel 12 V Compass Light SSteel railing SSteel Fuel Tank SSteel Fuel Fill Fuel Gauge Fuel Tank Sender ...

Page 15: ...in switch Outboard Engine Negative Bus Running Lights Horn Bilge Pump 1 Anchor Lights Cabin Lights Livewell Pump Macerator Water Pump Charge Plug Bilge Pump 12 V Bilge Pump 12 V Switch Panel 12 V Switch Panel 12 V Fuel Gauge Fuel Tank Sender SSteel railing SSteel Fuel Fill SSteel Fuel Tank ...

Page 16: ...NORTHSTAR MANUAL 12 MAINTENANCE LOG DATE HOURS MAINTENANCE PERFORMED BY WHO ...

Page 17: ......

Page 18: ......

Reviews: