C-Series IM 1 MAY 2014
14.0 MAINTENANCE
It is recommended that maintenance and inspection be performed on a scheduled basis. Maintenance
requirements may vary widely for each installation and specific operating conditions. It is suggested that a
complete inspection be performed with necessary maintenance at the end of the first month, the first three
months, and the first six months. These inspections will indicate how often future maintenance will be
necessary.
All electrical, mechanical repairs and tests are to be performed by qualified personnel only.
Disconnect electric power from control box before opening panel for maintenance.
Depressurize pneumatic system before performing maintenance or repairs on pressure containing
components. Check all pressure gauges to ensure that depressurization has occurred.
Cutter enclosure may be hot. Components inside the enclosure will be hotter than the air inside,
especially the servomotor and resistor.
Do not disable or bypass equipment safety features.
Refer to system component manuals for additional information.
WARNING: Before beginning repair work, disconnect all power sources and
secure against inadvertent reconnection.
WARNING: Auxiliary equipment may contain moving parts that may cut, crush, or
otherwise injure personnel when safety/access covers are removed. Do not place
hands or limbs in equipment during operation.
At Startup
Verify all guards are in place and able to be fully closed.
Ensure blades are attached securely.
Record equipment Serial Numbers and the NC Controller program revision level.
Every bushing or blade change
Verify free motion of blade(s) past bushings and that bushing gap is properly set
Daily
Clean bushings and lubricant tray.
Every 3 Months
Check all electrical connections to make sure that they have not become loose, especially those
connections at contactors, like motor starters.