background image

- 6 - 

REV-201М

     

                                                                                                                                                       

NOVATEK-ELECTRO

 

1.2.3.3

 

Intermittent 1”

 operation mode  

In the figure 4 there is represented the working algorithm of relay "

 Intermittent 1

”. 

 

 

 

 

Figure 4

 

– The working algorithm of relay “

Intermittent 1”

 

 

Time  counting  on each channel  starts from  the moment  of  power  supply  to 

the terminals «

L1-N

» (Channel 1); 

«

L2-N

» (Channel 2). Each channel has two adjustments 

T1 

and 

T2

When  the  power  supply  is  given  to  channel  then  the  time  reading 

T1

  starts,  adjusted  by  the  knobs  of 

potentiometers 3, 12 (figure 1) for the 1-st and the 2-nd channels correspondently 

– time of pause. at this moment 

GREEN LED indicator glows and the power load is turned OFF.  

After the termination of this time interval (

T1

) power load turns ON and starts the timing countdown of another 

interval  (

T2

)  that  is  adjusted  by  lower  potentiometer  knob  5,  10  (figure  1),  for  the  1-st  and  the  2-nd  channels 

correspondently 

– time of work and this is indicated with the RED LED indicator. 

After  the  termination  of  the 

T2

  timing  countdown REV-201M  turns  OFF  the power load  and  the  LED indicator 

changes  to  GREEN.  From  this  moment  new  countdown  basing  the 

T1

  timing  starts  and  the  process  keep  on 

working in cycle mode in this way further. 

Note

 

– if the time interval of potentiometer 

Т2

 is equal to zero, the load relay will not switch over. 

 

1.3.3.4

  Control (pre-starting signalization

)

 operation function  

 
 
 
 
 
 
 
 
 
 

 

 
 
 

 

Figure 5

 

– The working algorithm of relay Control (pre-starting signalization)  

 

ATTENTION! For the proper operation of REV-201M it should be connected in accordance with the 

parallel channels operation 

– Mode 2 (for details kindly see paragraph 1.1. Application). 

 

After the power supply is given to the input terminals REV-201M turns 

ON

 the power load for the Channel 1 

– 

simultaneously 

RED

 LED (

Channel 1

) and 

GREEN

 LED (

Channel 2

) indicator starts glowing 

– this indicates about 

the preliminary signalization with the fixed time delay of 10 seconds. 

After  this  interval  the  output  relay  of  the  “Channel  1”  turns 

OFF

  for  the  fixed  time  of  30  seconds 

–  this  is 

indicated by 

GREEN

 

LED glowing on the “Channel 1”. 

After  the  expiration  of  the  pause  for  the  “Channel  1” 

GREEN

  LED  change  the  color  to 

RED

 

–  second 

announcement signal with the time of 30 seconds; 

After the end of the se

cond announcement signal the output relay of the “Channel” 1 turns 

OFF

, LED changes 

from 

RED

 to 

GREEN

 

and the output relay of the “Channel 2” turns 

ON

. At the same time 

GREEN

 LED of the 

 

“Channel 2” change the color to 

RED

 and switches to 

IDLE

 state. 

If you want to restart the algorithm 

– you will have to turn 

OFF

 the power supply and turn it 

ON

 afterwards.  

 
 
 

Summary of Contents for REV-201?

Page 1: ...NOVATEK ELECTRO Ltd Intelligent industrial electronics MULTIFUNCTIONAL TWO CHANNEL TIME DELAY RELAY REV 201 OPERATING MANUAL Review the Operating manual before using the unit www novatek electro com...

Page 2: ...PT TO REMOVE AND REPAIR THE UNIT Some of the unit components may be live NEVER ATTEMPT TO OPERATE THE UNIT WITH THE MECHANICAL DAMAGE OF THE HOUSING The unit is not designed for operation under impact...

Page 3: ...ioning in one compact case housing 2 time delay relays in one case Mode 2 Parallel operation of the channels To each of two channels the power supply is applied simultaneously Thus the time countdown...

Page 4: ...more then 0 150 Outer dimensions Figure1 Operation temperature range from 30 to 55 Storage temperature from 45 to 60 Arbitrary mounting position Standard 35 mm DIN rail mounting Electrical characteris...

Page 5: ...the power supply source is applied to the input terminals L1 N Channel 1 L2 N Channel 2 Time delay setting is selected using the knobs of potentiometers 3 5 10 12 figure 1 Each channel has two adjusta...

Page 6: ...further Note if the time interval of potentiometer 2 is equal to zero the load relay will not switch over 1 3 3 4 Control pre starting signalization operation function Figure 5 The working algorithm o...

Page 7: ...ED of this channel is on and the time reading begins T1 T2 After delay time period the load relay switches off the LED changes the light to green and the relay turns in standby mode The restart of rel...

Page 8: ...s mode the supply voltage of the second channel is used as the main power supply for the relay and the power input of the first channel is used as the control signal 2 GENERAL USE AND APPLICATION 2 1...

Page 9: ...this time interval T1 the relay contacts get open and starts the timing countdown of set time interval T2 After the termination of the T2 timing countdown REV 201M starts and the process keep on work...

Page 10: ...t is strictly prohibited to use simultaneously both power supply inputs for 24V DC and mains 230 240 VAC Only one power supply input should be used 2 2 USAGE AND OPERATION OF REV 201M Connect the powe...

Page 11: ...shall provide a free repair of the unit within the warranty period if all the provisions of user manual were complied with by the consumer The unit shall not be subject to warranty service in the foll...

Reviews: