Note

 

– if the time interval of potentiometer Т1 is equal to zero, the load relay will not switch over. 

 
1.3.3.7 Turn-off Delay 

 

Figure 8 shows the relay operation algorithm for 

“Turn-off Delay”. 

 

 

Figure 8 

– 

The working algorithm of relay

 

“Turn-off Delay” 

 

After  voltage  supplies  to  the  second  channel,  the  green  LED  of  the  second  channel  lights  up  and  the  relay 

switches to the standby mode. 

When voltage supplies to the first channel, the green LED of the first channel lights up and timing of T1 + T2 of 

the first channel is started. 

Upon  completion  of  time-delay  the  load  relay  of  the  second  channel  is  activated,  LED  of  the  second  channel 

changes its color to red and the relay switches to standby mode. 

In case of power failure in the first channel, the green LED of the first channel is off and timing of T1 + T2 of the 

second channel is started. 

Upon  completion  of  time-delay  the  load  relay  of  the  second  channel  is  disabled,  LED  of  the  second  channel 

changes its color to green and the relay switches to standby mode. 

 

Note

:  In  this  mode,  the  supply  voltage  of  the  second  channel  is  used  as  the  main  power  supply  for  the 

relay and the power input of the first channel is used as the control signal. 

 

2  GENERAL USE AND APPLICATION 

 

2.1  FIRST START UP PREPARATIONS 

 

ATTENTION!

  All settings and adjustments of REV-201M should be made on deenergized device. 

 

 

All wiring or cable connections (disconnections) to the REV-201M must be necessarily made on fully deenergized 

device. 

Adjustment should be made in the following sequence: 

-

 Setting the operation algorithm 

-

 Setting of timing parameters and delays 

 

IMPORTANT NOTICES: 

-

When changing the operation algorithm it’s necessary to take into account that newly set up algorithm will

 

take  effect  only  after full  deenergization  of  the  REV-201M  (not  less

 

then 1  second),  input  terminals  with 

the subsequent turning ON of the device.  

-

 

After changing the time setting of the relay being energized it is necessary to note that a new time setting 

will be effective only since the next cycle of relay work. 

 

2.1.1  

Operation algorithms selection 

List of the operation algorithms is shown in the Table 2 below.  
For more details kindly see paragraphs 1.3.3. 
Select the required operation algorithm and set an appropriate position of 

DIP switches “

A

” (Figure 1). 

 
 
 
 

Summary of Contents for REV-201?

Page 1: ...NOVATEK ELECTRO Ltd Intelligent industrial electronics MULTIFUNCTIONAL TWO CHANNEL TIME DELAY RELAY REV 201 OPERATING MANUAL Review the Operating manual before using the unit www novatek electro com...

Page 2: ...PT TO REMOVE AND REPAIR THE UNIT Some of the unit components may be live NEVER ATTEMPT TO OPERATE THE UNIT WITH THE MECHANICAL DAMAGE OF THE HOUSING The unit is not designed for operation under impact...

Page 3: ...ioning in one compact case housing 2 time delay relays in one case Mode 2 Parallel operation of the channels To each of two channels the power supply is applied simultaneously Thus the time countdown...

Page 4: ...more then 0 150 Outer dimensions Figure1 Operation temperature range from 30 to 55 Storage temperature from 45 to 60 Arbitrary mounting position Standard 35 mm DIN rail mounting Electrical characteris...

Page 5: ...the power supply source is applied to the input terminals L1 N Channel 1 L2 N Channel 2 Time delay setting is selected using the knobs of potentiometers 3 5 10 12 figure 1 Each channel has two adjusta...

Page 6: ...further Note if the time interval of potentiometer 2 is equal to zero the load relay will not switch over 1 3 3 4 Control pre starting signalization operation function Figure 5 The working algorithm o...

Page 7: ...ED of this channel is on and the time reading begins T1 T2 After delay time period the load relay switches off the LED changes the light to green and the relay turns in standby mode The restart of rel...

Page 8: ...s mode the supply voltage of the second channel is used as the main power supply for the relay and the power input of the first channel is used as the control signal 2 GENERAL USE AND APPLICATION 2 1...

Page 9: ...this time interval T1 the relay contacts get open and starts the timing countdown of set time interval T2 After the termination of the T2 timing countdown REV 201M starts and the process keep on work...

Page 10: ...t is strictly prohibited to use simultaneously both power supply inputs for 24V DC and mains 230 240 VAC Only one power supply input should be used 2 2 USAGE AND OPERATION OF REV 201M Connect the powe...

Page 11: ...shall provide a free repair of the unit within the warranty period if all the provisions of user manual were complied with by the consumer The unit shall not be subject to warranty service in the foll...

Reviews: