WAAS GUS Signal Generator User Guide Rev 1
15
Chapter 2
Minimum Connections
When installed in a GUS, the Signal Generator requires the following connections:
AC Power - to the local mains supply to power the Signal Generator
L1 and/or L5 CMP - Comparator Message Processor as the WAAS message source
L1 and/or L5 WMP - WAAS Message Processor as the Signal Generator control terminal
10 MHz In - from the System 10 MHz Reference Source
1 PPS In - from the System 1 PPS Reference Source
L1 and/or L5 IF Output - to the Satellite Uplink path as the main Signal Generator output signal
L1 and/or L5 RF Output - to the local Signal Generator signal monitoring facility
All of the above connections are described in more detail in Chapter 3,
To demonstrate and/or experiment with signals generated by the Signal Generator in a test environment, outside of
the GUS, refer to the setup shown in
. Additional information on using the Signal Generator in
a test environment can be found in the WAAS SIGGEN GUI User Guide (NovAtel Document D25548) and
WAAS SIGGEN UDSM User Guide (NovAtel Document D25598).