Chapter 3: Using the AdminStudio Interface
Workflows and Projects
126
ADS-0950-UG00
AdminStudio 9.5 User Guide
Filtering Projects
Task:
To display a specific project:
1.
From the Interface, click the
Projects
tab.
2.
From the drop-down menu above the Projects tree, select the project you want to display.
Executing Projects
Task:
To execute a project:
1.
From the Interface, click the
Projects
tab.
2.
Display the project you want to execute. If you want to only display that project, use the filter above the
Projects tree.
3.
Click the first task in the project.
4.
Perform the task.
5.
When finished with the task, click the box to the left of the task.
6.
Repeat for subsequent tasks in the project.
Running Associated Tools in Projects
Task:
To run a tool associated with a task:
1.
Select the
Projects
tab from the Interface.
2.
Expand a Project in the Projects tree to display all of its tasks.
3.
Right-click the task with which the tool is associated and select Run Task from the context menu.
Note •
In AdminStudio, tools are any external application or file that you can launch from a workflow or project. This
typically is an application, but can be a simple document or batch file necessary to completing the project.
Summary of Contents for ADMINSTUDIO 9.5
Page 1: ...AdminStudio 9 5 User Guide Version 9 5...
Page 50: ...Contents 50 ADS 0950 UG00 AdminStudio 9 5 User Guide...
Page 52: ...52 ADS 0950 UG00 AdminStudio 9 5 User Guide...
Page 156: ...156 ADS 0950 UG00 AdminStudio 9 5 User Guide...
Page 440: ...440 ADS 0950 UG00 AdminStudio 9 5 User Guide...
Page 1090: ...1090 ADS 0950 UG00 AdminStudio 9 5 User Guide...
Page 1426: ...1426 ADS 0950 UG00 AdminStudio 9 5 User Guide...
Page 1686: ...1686 ADS 0950 UG00 AdminStudio 9 5 User Guide...
Page 1794: ...Chapter 24 AdminStudio Public API Reference 1794 ADS 0950 UG00 AdminStudio 9 5 User Guide...
Page 1842: ...Index 1842 ADS 0950 UG00 AdminStudio 9 5 User Guide...