Schedule Panel
On the
Schedule
panel of the Package Auto Import Wizard you can choose to enable automatic import of linked
packages (or packages in a monitored Network Directory), and can also specify how often the Remote Application
Catalog or Network Directory will be checked for updates.
The following options are included:
Summary Panel
The
Summary
panel provides a detailed summary of the options that were selected in the previous panels of the
Wizard. Click
Finish
to complete the remote link. Clicking
Back
returns you to the previous panel.
Merge Wizard
The Merge Wizard, available by clicking
Merge
on the
Catalog
menu, allows you to merge application data
between two Application Catalogs.
The source Application Catalog’s data is merged into the currently open Application Catalog. This is a one-time-
only database merge. The merged data is not linked in any way to the source Application Catalog.
Merging could be used in an organization where multiple people test packages. After the packages have been
tested, all of the “tested” applications could be consolidated into one centralized Application Catalog. Another
reason to merge Application Catalogs would be a need to have the same data available in multiple geographic
locations.
Table 6-74 •
Schedule Panel Properties
Option
Description
Schedule AdminStudio
to update the changed
packages
Select this option to enable automatic import of the linked packages (or
packages in the monitored Network Directory) at scheduled intervals. When this
option is selected, the rest of the scheduling fields on this panel are enabled.
Run the process
Select Daily or Weekly to specify how often you want the Remote Application
Catalog or Network Directory to be checked for updates.
At
Select the time of day that you want the automatic import to occur by selecting
the hour, minutes, seconds, or AM/PM setting and then clicking the up and down
arrows to adjust the setting.
Starting on
Click on the arrow to open the Calendar and then select the first day that you
want automatic importing to occur.
Summary of Contents for ADMINSTUDIO 9.5
Page 1: ...AdminStudio 9 5 User Guide Version 9 5...
Page 50: ...Contents 50 ADS 0950 UG00 AdminStudio 9 5 User Guide...
Page 52: ...52 ADS 0950 UG00 AdminStudio 9 5 User Guide...
Page 156: ...156 ADS 0950 UG00 AdminStudio 9 5 User Guide...
Page 440: ...440 ADS 0950 UG00 AdminStudio 9 5 User Guide...
Page 1090: ...1090 ADS 0950 UG00 AdminStudio 9 5 User Guide...
Page 1426: ...1426 ADS 0950 UG00 AdminStudio 9 5 User Guide...
Page 1686: ...1686 ADS 0950 UG00 AdminStudio 9 5 User Guide...
Page 1794: ...Chapter 24 AdminStudio Public API Reference 1794 ADS 0950 UG00 AdminStudio 9 5 User Guide...
Page 1842: ...Index 1842 ADS 0950 UG00 AdminStudio 9 5 User Guide...