44 - EN
These assembly, operation and maintenance instructions must be kept for the entire period of use!
10
Disposal
Dispose of packaging material in an environmentally
friendly way and in accordance with the applicable
local disposal regulations.
The symbol with the crossed-out waste bin on
waste electrical or electronic equipment stipulates
that this equipment must not be disposed of with the
household waste at the end of its life. You will find
collection points for free return of waste electrical and
electronic equipment in your vicinity. The addresses
can be obtained from your municipality or local ad-
ministration. The separate collection of waste elec-
trical and electronic equipment aims to enable the re-
use, recycling and other forms of recovery of waste
equipment as well as to prevent negative effects for
the environment and human health caused by the
disposal of hazardous substances potentially con-
tained in the equipment.
11
Warranty terms
Please note that the scope of the warranty is restric-
ted to commercial use of the dock leveller. The full
text of the warranty terms can be found at:
https://www.novoferm.de/garantiebestimmungen
12
Declaration of Conformity
Translation of the Original Declaration of Conformity
in accordance with the
EC Machinery Directive 2006/42/EC,
Annex II, Part 1, Section A
We, Docking Solution und Service GmbH, declare
under our sole responsibility that the product
described below has been developed, designed and
manufactured in accordance with the requirements of
the EC Machinery Directive as
amended. 2006/42/EG.
Product:
NovoDock L530
Product type:
Hydraulic dock leveller
with feed
Model:
DSL00530
Year of manufacture
from:
2021
Relevant EU directives:
•
2014/30/EU
•
2011/65/EU
Applied harmonised standards:
•
EN 1398:2009
•
EN ISO 13854:2019
•
EN ISO 13849-1:2015
•
EN ISO 13849-2:2012
•
EN 60529:1991/AC:1993
•
EN ISO 13850:2015
•
EN ISO 4413:2010
•
EN ISO 14118:2018
•
EN 60204-1:2018
•
EN ISO 12100:2010-11
Manufacturer and name of the authorised repres-
entative of the technical documentation:
Docking Solution and Service GmbH
Springrad 4
30419 Hannover, Germany
Place and date of issue:
Hanover,
01.04.2021
Michael Menzel, Managing director
Summary of Contents for NovoDock L530
Page 139: ...A3 c 4 x...
Page 141: ...A5 c 4 x 181 250 mm DZ2 100 180 mm DZ1...
Page 150: ......
Page 151: ......
Page 152: ...docking Solution und Service GmbH Springrad 4 30419 Hannover Germany DS0805301 05 2022...