© 2022 Genesis Attachments, LLC
Genesis GXT Mobile Shear 5
HYDRAULIC START-UP
28
Start-up Procedure 28
GENERAL OPERATION INSTRUCTIONS 29
Start-up 29
Efficient and Productive Operation
29
Cutting Larger Materials 30
Chatter While Cutting 30
Pulling / Back-Tracking 31
Pushing / Tracking Forward 32
Cutting in a Pile 33
MAINTENANCE SAFETY 34
MAINTENANCE SCHEDULE
36
Scheduled Maintenance 36
Four-Hour Checklist 37
Eight-Hour Checklist 37
LUBRICATION POINTS 38
BOLT TORQUE SPECS 39
BLADE MAINTENANCE
40
AUTOGUIDE
41
AutoGuide Adjustment Procedure 41
PIERCING BLADES
42
Replacement 44
GUIDE BLADES
45
Shimming 45
Rotation 46
Replacement 46
Adjustment Plates 46
PRIMARY AND SECONDARY BLADES
47
Removal 47
Adjustment Plates 48
Rotation 48
Blade Gap 49
Blade Gap Measuring Procedure 49
Shimming 49
RAZOR BLADE
50
GENERAL WELDING GUIDELINES
51
Welding Ground Clamp 51
Welding Rules 51
BUILD-UP
52
HARD-SURFACING
53
HARD-SURFACING PATTERNS
54
HYDRAULIC/ROTATION MAINTENANCE
55
Hydraulic Requirements 55
Rotation Valve Input 55
GenFlow Regeneration Valve 56
Regeneration Valve Adjustment 56
TABLE OF CONTENTS