NRG Instructions
SRA System | All-Weather PVH Kit
SRA_All-Weather_PVH_Kit_Instructions
Rev. 5.0
support@nrgsystems.com | Page 10
18 April 2018
2.2.4 Attach frame crosspiece and top tower mount to the main assembly.
Thread 1/4-20x.375 bolts (#11697) through small corner brackets and into slide nuts (Figure 2-7).
Figure 2-7: Corner brackets for use with aluminum rails; slide nuts and bolts are attached.
Slide corner brackets onto the ends of the 25” aluminum crosspieces (Figure 2-8). Orient the corner
brackets so that the round hole is touching the crosspieces (the oval holes will attach to the long, PV-
mounted rails). Do not tighten yet.
Figure 2-8: Corner brackets attached to crosspiece. Note the orientation of the hinge.
Slide the crosspieces onto the 65” rails of the main assembly. The top tower mount goes behind the top
PV panel, about 1” from the end. The single 25” crosspiece goes about 24” from the bottom of the
vertical rails. There should be about 1/2” of space at each end of the crosspieces. Tighten all corner
bracket hardware (Figure 2-9, Figure 2-10, following page).